Manhattan · Block 10 · Lot 15 · 10004

27 Whitehall Street

7 floors · 14,829 sq ft · built 1921 · class O6 · owner of record: Msa Twins Ltd.

9open violations
$10,350ECB/OATH penalties owed
0HPD class C (immediately hazardous)
467dto Facade inspection report (Cycle 10B)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $52,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 467 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 781 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-01 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (7) · $10,350 owed
IssuedViolationHearingBalance
Aug 21, 2026Signs CLASS - 2
ATOI OBSERVED STORE FRONT SIGN AT EXPOSURES 1 AND 2 HAS BEEN ALTERED FROM 2025. NO PERMITS ON FILE WITH DEPARTMENT FOR ALTERATION, OBTAIN ALL REQUIRED PERMITS
#39201317M
Oct 29, 2026
IN VIOLATION
$1,250
Aug 5, 2026Construction CLASS - 1
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39170142K ISSUED 12/11/2025 FOR AN ELECTRICAL PANEL, METER, AND BX CABLES INSTALLED AT TH
#39199319X
Oct 15, 2026
IN VIOLATION
$2,500
Aug 5, 2026Construction CLASS - 1
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39170143M ISSUED 12/11/2025 FOR FIVE UNCAPPED CAST-IRON GAS LINES AT THE CELLAR WITH A CO
#39199318Y
Oct 15, 2026
IN VIOLATION
$2,500
Dec 11, 2025Construction CLASS - 1
ATOI OBSERVED 5 CAST IRON NATURAL GAS LINES INSTALLED AND UNCAPPED IN CELLAR, ALSO OBSERVED COPPER LINE PROTRUDING FROM FLOOR @ GROUND LEVEL FROM CELLAR. NO PERMIT ON FILE FOR SCOPE OF WORK., OBTAIN PERMIT
#39170143M
Oct 5, 2026
IN VIOLATION
$2,500
Dec 11, 2025Unknown CLASS - 1
ATIO OBSERVED NEW ELECTRICAL PANEL AND METER WITH NEW BX CABLES INSTALLED IN CELLAR. NO PERMIT ON FILE FOR SCOPE OF WORK., OBTAIN PERMIT
#39170142K
Oct 5, 2026
IN VIOLATION
$1,600
Aug 21, 2024Boilers CLASS - 2
FOUND WEIL MCLAIN(MODEL # EGH 125P)GAS FIRED BOILER ON ROOF WITH SPILL SWITCH NOT CONNECTED. CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CORRECTION
#39122653X
Aug 21, 2025
IN VIOLATION
$0
Aug 21, 2024Boilers CLASS - 2
FOUND 1 SLANT FIN(MODEL#SE 70EDP) GAS FIRED BOILER IN CELLAR OF STORE NOT REGISTERED, MAINTAIN BOILER; CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CORRECTION
#39122650K
Aug 21, 2025
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Aug 21, 2026ECBSigns: ATOI OBSERVED STORE FRONT SIGN AT EXPOSURES 1 AND 2 HAS BEEN ALTERED FROM 2025. NO PERMITS ON FILE WITH DEPARTMENT FOR ALTERATION, OBTAIN ALL REQUIRED PERMITSOpen
Aug 5, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39170142K ISSUED 12/11/2025 FOR AN ELECTRICAL PANEL, METER, AND BX CABLES INSTALLED AT THOpen
Aug 5, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39170143M ISSUED 12/11/2025 FOR FIVE UNCAPPED CAST-IRON GAS LINES AT THE CELLAR WITH A COOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 2:55 PM ET. BBL 1000100015.

Look up another building