2 floors · 2 apartments · 3,516 sq ft · built 1910 · class S2 · owner of record: Samuel-Wilson, Utid Samuel
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 18 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 5, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO OBTAIN WORK PERMITS FOR VIOLATION #39081249X. NO PERMITS ON FILE TO INSTALL 3PC BATHROOM, ELECTRICAL AND FLOOR TO CEILING WALLS IN GARAGE., COMPLY WITH COMMISS #39179296Y | Apr 22, 2027 DEFAULT | $12,500 |
| Mar 5, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #39081248Y, FILE A CERTIFICATE OF CORRECTION #39179297X | Dec 18, 2026 PENDING | $1,250 |
| Mar 10, 2023 | Construction CLASS - 1 GARAGE CONVERTED INTO AN ILLEGAL CLASS A APARTMENT WITH THREE PIECE BATHROOM, PLUMBING FOR KITCHEN SINK, FULL HEIGHT PARTITION WALLS FLOOR TO CEILING ERECTED TO CREATE ROOMS FOR LIVING. INADEQUATE EGRESS ONE WA #39081248Y | Sep 28, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 15, 2023 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE #00037 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 15, 2023 | Structurally Compromised Buildings FTF-SC-INITL | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 2, 2009 | B | Apt BASEM · SECTION 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS SINK,SHOWER STALL, WATER CLOSET AND WASH BASIN IN THE ENTIRE APARTMENT LOCATED AT APT BASEM | Jan 6, 2010 |
| Dec 2, 2009 | B | Apt BASEM · SECTION 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE .. IN THE ENTIRE APARTMENT LOCATED AT APT BASEM | Jan 6, 2010 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 4:30 PM ET. BBL 3078080001.