10 floors · 20,358 sq ft · built 1903 · class O6 · owner of record: 27 East Coll Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-05-25 (Accepted). Agency page | Dec 31, 2026 in 42 days | 1 of 1 without an accepted 2026 report yet |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $93,750 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 459 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1138 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 1, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDING AS NOTED:AT TIME OF INSPECTION RESPONDENT DID NOT COMPLY TO PREVIOUS VIOLATION#35538752P.REM:REPAI #35537983H | Feb 24, 2021 DEFAULT | $3,125 |
| Oct 1, 2020 | Construction CLASS - 1 FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED AS NOTED:AT TIME OF INSPECTION I OBSERVED ON EXPOSURE#1 SOUTH ELEVATION:LACKS IN DECORATIVE STONE AT 1ST FLOOR SPANDREL AT SEVERAL LOCATIONS EXPOSURE#4 EAST ELEVA #35537984J | Dec 17, 2020 IN VIOLATION | $2,500 |
| Sep 4, 2020 | Construction CLASS - 3 FAILURE TO POST BUILDING EXTERIOR WALL CONDITION CERTIFICATION AS REQUIRED UNDER 1RCNY 103-04(F)AT TIME OF INSPECTION THE BUILDING EXTERIOR WALL CONDITION CERTIFICATION WAS NOT POSTED.REM:POST BUILDING EXTERIOR #35538649R | Nov 12, 2020 IN VIOLATION | $250 |
| Jul 16, 2020 | Construction CLASS - 1 FAILURE TO REPAIR SWARMP CONDITIONS IN A TIMELY MANNER.NOTE:ON 07/16/2020,NO EVIDENCE OF DETERIORATED MAGNARY ON THE EAST ELEVATION EXPOSURE4 REPAIRS WAS FOUND.QEWI,DEBRIS ACAR IDENTIFIED THESE SWARMP CONDITION #35538752P | Sep 16, 2021 DEFAULT | $25,000 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #02733 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #02737 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #05346 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01370 | DOB VIOLATION - ACTIVE |
| Oct 14, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00033 | DOB VIOLATION - ACTIVE |
| Aug 8, 2014 | ELEVATOR #9027/515021 | DOB VIOLATION - ACTIVE |
| Aug 8, 2002 | LOCAL LAW 11/98 - FACADE #NRF50703 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Oct 14, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 3:38 AM ET. BBL 1008500022.