Manhattan · Block 590 · Lot 56 · 10014

27 Barrow Street

7 floors · 31,504 sq ft · built 1917 · class W8 · owner of record: Coop-Soc Settlemnt So

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
187dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 31,504 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $76,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 483 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1162 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Feb 13, 2024Construction CLASS - 2
AT TIME OF INSPECTON I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE # 1 WITHOUT SIGNS OR PROJECT INFORMATION PANEL ON THE SHED PARAPET, TO DISPLAY THE NAME AND THE CONTACT INFORMATION OF THE OWNER OR THE GENER
#39525577J
Sep 5, 2024
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00408
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 6:36 PM ET. BBL 1005900056.