2 floors · 2 apartments · 2,240 sq ft · built 1920 · class S2 · owner of record: Vigna, Zachary
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 313 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 14, 2026 | Construction CLASS - 1 FAILURE TO GET A CERTIFICATE OF CORRECTION FOR VIOLATION NUMBER 39151325J, COMPLY WITH COMMISSIONER'S ORDER #39196011X | Jan 26, 2027 PENDING | $2,500 |
| Jul 14, 2026 | Construction CLASS - 1 FAILURE TO GET A CERTIFICATE OF CORRECTIONS 39151324H, COMPLY WITH COMMISSIONER'S ORDER #39196010Y | Jan 26, 2027 PENDING | $2,500 |
| Jun 17, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED A UNPERMITTED EXTENSION WITH LANDING , SIZE APPROX. 10FT. IN LENGTH BY 6FTH IN WIDTH BY 10FT.IN HEIGHT WITH NEW DOOR INSTALLED AND STAIR EXPOSURE#2 WITH A PERMIT NEED TO O #39151324H | Jan 26, 2027 PENDING | $2,530 |
| Jun 17, 2025 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARDRAILS AT EXPOSURE #2 AROUND THE PERIMETER OF THE EXTENSION OR STAIR WELL AND PROVIDE PROVIDE GUARD RAILS AND COMPLY WITH #39151326L | Jan 26, 2027 | $5,030 |
| Jun 17, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED APPROX. 12:30PM ELECTRICAL WORK IN PROGRESS WITH APPROX. 3 CABLE COMING TRUE THE WALL AT EXPOSURE # 2 NO PERMIT ON FILED WITH DOB. REMEDY, OBTAIN PERMIT #39151325J | Jan 26, 2027 PENDING | $2,530 |
| Jun 17, 2025 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION -NO HANDRAILS .ATOI I OBSERVED AT EXPOSURE#1 X 2 A REBUILT STAIR NO HANDRAILS IN PLACE, NEED TO PROVIDE HANDRAILS ON STAIRWELL A #39151323X | Jan 26, 2027 | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| May 8, 1998 | PLUMBING #STM01VW | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 14, 2026 | ECB | Construction: FAILURE TO GET A CERTIFICATE OF CORRECTION FOR VIOLATION NUMBER 39151325J, COMPLY WITH COMMISSIONER'S ORDER | Open |
| Jul 14, 2026 | ECB | Construction: FAILURE TO GET A CERTIFICATE OF CORRECTIONS 39151324H, COMPLY WITH COMMISSIONER'S ORDER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 1:08 PM ET. BBL 4008550036.