Manhattan · Block 2029 · Lot 1 · 10030

2692 8 Avenue

21 floors · 246 apartments · 216,247 sq ft · built 1965 · class D6 · owner of record: Nyc Housing Authority

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 110 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 216,247 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 789 days
Next cycle year 2028
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2029). Agency page

Dec 31, 2029
in 1154 days
Next due 2029

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (4) · C 0 · B 3 · A 1
IssuedClassViolationCorrect by
Dec 2, 2013BApt 3A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WIMDOW COUNTER BALANCES TOP AND BOTTOM SASHES IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTHJan 6, 2014
Dec 2, 2013AApt 3A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTHMar 7, 2014
Dec 2, 2013BApt 3A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MORTESE DOOR LOCK IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTHJan 6, 2014
Dec 2, 2013BApt 3A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT EAST WALL IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTHJan 6, 2014

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 4:35 AM ET. BBL 1020290001.

Look up another building