Brooklyn · Block 3046 · Lot 7501 · 11206

269 Meserole Street

4 floors · 18 apartments · 17,886 sq ft · built 1920 · class RM · owner of record: 269 Meserole St Realty Llc

32open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
65dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 309 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (8)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
HPD (24) · C 1 · B 6 · A 17
IssuedClassViolationCorrect by
May 21, 2025A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR THAT IS MISSING AT PUBLIC HALL, 1st STORYAug 24, 2025
May 21, 2025A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYAug 24, 2025
May 21, 2025A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX THAT IS MISSING AT PUBLIC HALL, 1st STORYAug 24, 2025
May 21, 2025A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.Aug 24, 2025
Sep 6, 2024BApt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL (APPROX. 3 SQ. FT.) IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16926733 ISSUED 25-APR-24 HAS BEEN UPGRADED TO CLASS B PER ADOct 11, 2024
Sep 6, 2024BApt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AT WINDOW RECESS (APPROX. 1 SQ. FT.) [2ND FROM NORTH AT EAST] IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16926742 ISSUED 25-APR-24Oct 11, 2024
Sep 6, 2024BApt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW RECESS AT NORTH WALL (APPROX. 4 SQ. FT.) [1ST FROM NORTH AT EAST] IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16926741 ISSUED 25-APROct 11, 2024
Sep 6, 2024BApt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW RECESS AT NORTH WALL (APPROX. 1 SQ. FT.) [3RD FROM NORTH AT EAST] IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16926740 ISSUED 25-APROct 11, 2024
Sep 6, 2024BApt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW RECESS AT NORTH WALL (1ST FROM NORTH AT EAST) [APPROX. 2 SQ. FT.] IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16926737 ISSUED 25-APR-24 HAS Oct 11, 2024
Sep 6, 2024BApt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH AND SOUTH WALLS AT WINDOW RECESS (2ND FROM NORTH AT EAST) IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16926738 ISSUED 25-APR-24 HAS BEEN UPGROct 11, 2024
May 9, 2024AApt 2C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHAug 12, 2024
May 9, 2024AApt 2C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHAug 12, 2024
May 9, 2024AApt 2C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHAug 12, 2024
May 9, 2024AApt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR (WARPED ) IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHAug 12, 2024
May 9, 2024AApt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHAug 12, 2024
Apr 29, 2024AApt 2E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW RECESS AT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 2, 2024
Apr 29, 2024A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALLAug 2, 2024
Apr 29, 2024C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORYMay 5, 2024
Apr 29, 2024A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYAug 2, 2024
Apr 29, 2024A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.Aug 2, 2024
Apr 29, 2024A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORYAug 2, 2024
Apr 29, 2024A§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORYAug 2, 2024
Apr 29, 2024A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYAug 2, 2024
Apr 29, 2024A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORYAug 2, 2024

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 11:06 AM ET. BBL 3030467501.

Look up another building