2 floors · 3 apartments · 3,195 sq ft · built 1901 · class C0 · owner of record: Shlome Masri, Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 3, 2006 | Construction Hazardous FAILURE TO MAINTAIN BLDG-HAZARDOUS. FRONT STEPS IN DISREPAIR-BROKEN AND CRACKED TREADS AND RISERS. DEBRIS THROUGHOUT-CELLAR. REMEDY: MAKE SAFE IMMEDIATELY-MAKE ALL NECESSARY IMMEDIATELY-REMOVE DEBRIS IMMEDIATEL #34515512H | May 19, 2006 WRITTEN OFF | $0 |
| Apr 3, 2006 | Construction Hazardous FAILURE TO PROVIDE TWO MEANS OF EGRESS WHERE REQUIRED. FRONT STEPS AREHAZARDOUS AND CLOSED OFF. REMEDY: PROVIDE REQUIRED MEANS OF EGRESS AS PER CODE. #34515513J | May 19, 2006 WRITTEN OFF | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 1, 2009 | B | Apt 8 · § 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCY IN THE ENTIRE APARTMENT LOCATED AT APT 8, 1st STORY, 2nd APARTMENT FROM EAST AT SOUT | Oct 6, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 11:28 PM ET. BBL 2033000067.