class V0 · owner of record: Seagirt Buyer Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 17, 2026 | Construction CLASS - 2 DURING INSPECTION OF AN ACTIVE 5 STORY BUILDING, I OBSERVED LARGE AMOUNTS OF WHITE STUCCO PARTICLES AROUND THE PERIMETER OF THE SITE. IT WAS IN THE BUSHES, GRASS, STREET, ON CARS IN THE ADJACENT PROPERTY YARDS. #39553124P | Jan 12, 2027 | $5,000 |
| Apr 17, 2026 | Unknown CLASS - 1 BC 3303.2.3.1 TEMP LIGHTING: DURING INSPECTION OF A 5 STORY BUILDING, I OBSERVED ON THE 5TH FLOOR THAT THERE WAS NO LIGHTS ON THE FLOOR OR IN THE STAIR CASE. CREATING A TRIP HAZARD TO ANYONE WALKING AROUND IN T #39553125R | Jan 12, 2027 | $5,000 |
| Mar 27, 2026 | Unknown CLASS - 2 OBSERVED AT EXPOSURES 1, 2, AND 3, EXCESSIVE FOAM DEBRIS WAS PRESENT THROUGHOUT THE EXTERIOR OF THE JOBSITE. MATERIALS WERE NOT PROPERLY CONTAINED OR REMOVED AND WERE OBSERVED MIGRATING TO ADJACENT PROPERTIES, #39182159P | Dec 17, 2026 | $2,500 |
| Mar 26, 2026 | Construction CLASS - 1 PROPOSED 5 STORY NEW BUILDING. OBSERVED ACCUMULATION OF EXCESSIVE AMOUNTS OF COMBUSTIBLE DEBRIS, CONSTRUCTION MATERIALS, GARBAGE BAGS, LOOSE CABLES AND UNSECURED POWER TOOLS SCATTER ACROSS ENTIRE SITE CREATING #39552263K | Jan 14, 2027 | $2,500 |
| Mar 26, 2026 | Construction CLASS - 1 PROPOSED 5 STORY NEW BUILDING. OBSERVED ACTIVE SITE WITHOUT HANDRAILS ON SEVERAL STAIRWELLS ACROSS SITE CREATING UNSAFE CONDITIONS FOR FIRST RESPONDERS IN CASE OF AN EMERGENCY BY NOT PROVIDING PROTECTION IN A T #39552264M | Jan 14, 2027 | $5,000 |
| Mar 16, 2026 | Unknown CLASS - 2 5STORY NB. OBSERVED MATERIAL STORAGE ON STREET AT EXPO1. UPON RESEARCH ON DOTRECORDS, NO ACTIVE DOT PERMITS FOR STREET OCCUPANCY/STORAGE OF MATERIALS EXIST FOR THIS SITE. JERSEY BARRIERS NOT IN PLACE FOR PROTEC #39551836Y | Jan 5, 2027 | $625 |
| Mar 16, 2026 | Construction CLASS - 1 5STORY ACTIVE NB OBSERVED AREA AT EXPO3 W/O REQUIRED CONSTRUCTION FENCE MAKING JOBSITE ACCESSIBLE AND NOT MAINTAINED W/ PROPER SAFE MEANS OF EGRESS & INGRESS DURING OPERATIONS & NON-OPERATION HOURS. CONSTRUCTIO #39551831P | Jan 5, 2027 | $2,500 |
| Mar 16, 2026 | Unknown CLASS - 1 3307.6.5.1 OBSERVED SWS MUDSILLS AT EXPO2 WERE CRACKED AND DISLODGING PUTTING THE SWS AT RISK OF FAILING. IN MULTIPLE AREAS AT EXPO1, THE SWS MUDSILLS WERE INSTALLED ON UNFOUND SURFACES. INCREASED LOAD FROM PIP #39551837X | Jan 5, 2027 | $5,000 |
| Mar 16, 2026 | Construction CLASS - 1 ACTIVE 5STORY NB. 3303.4.4 OBSERVED EXCESSIVE ACCUMULATION OF CONSTRUCTION MATERIALS, DEBRIS & COMBUSTIBLE MATERIALS CREATE POTENTIAL FIRE HAZARD THRUOUT ENTIRE SITE, BLOCKING EGRESS/INGRESS & CREATING HAZARDOU #39551830N | Jan 5, 2027 | $2,500 |
| Mar 16, 2026 | Site Safety CLASS - 1 3301.13.7 ACTIVE 5STORY NB. CS #027121 JOBSITE W/ MULTIPLE DEFICIENCIES. OBS EXCESS DEBRIS THRUOUT SITE BLOCKING EGRESS/INGRESS, CREATING FIREHAZARDS, AERIAL OPS BY BOOM W/OUT HMO LICENSE, SITE ACCESSIBLE @EXPO #39551846H | Jan 5, 2027 | $10,000 |
| Mar 16, 2026 | Unknown CLASS - 1 5STORY ACTIVE NB. 3307.2.6 OBSERVED SIDEWALK SHED INSTALLED FOR NEIGHBOR @EXPO4 IS OBSTRUCTING THE NEIGHBORS WALKWAY LEAVING LESS THAN 2 FT OF CLEARANCE. OBSTRUCTING RESIDENCE WALKWAY CREATES AN UNSAFE & HAZARD #39551832R | Jan 5, 2027 | $5,000 |
| Mar 16, 2026 | Construction CLASS - 1 ACTIVE 5STORY NB. AT EXPO3 OBSERVED ACTIVE DELIVERY USING BOOM TRUCK TO DELIVER MATERIAL TO 4FLR, BETWEEN SCAFFOLD FRAMES, DELIVERY DIRECTLY ABOVE WORKERS W/ NO CAZ, NO FLAGGERS OR ANY SAFETY PROTOCOLS IN PLACE #39551835M | Jan 5, 2027 | $5,000 |
| Mar 16, 2026 | Unknown CLASS - 1 3301.1.2 & FC3304 ACTIVE 5STORY NB. HOT WORK OPS; CUTTING METAL CAUSING SPARKS OBSERVED WITHIN CLOSE PROXIMITY TO COMBUSTIBLE MATERIAL W/ NO FIRE GUARD PRESENT NOR HOTWORK PERMIT. NO FIRE EXTINGUISHER WITHIN RE #39551838H | Jan 5, 2027 | $5,000 |
| Mar 16, 2026 | Unknown CLASS - 2 ACTIVE 5STORY NB. OBSERVED AT EXPO3 ACTIVE DELIVERY USING BOOM TRUCK TO LIFT MATERIAL TO 4FLR. THE CROSS BRACE COMPONENTS OF THE PIPE SCAFFOLD WERE REMOVED TO RECEIVE DELIVERY OF MATERIALS W/O INSPECTION AS REQ #39551839J | Jan 5, 2027 | $2,500 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 6:30 PM ET. BBL 4157840001.