2 floors · 3 apartments · 2,040 sq ft · built 2007 · class C0 · owner of record: Kelani, Fatimat
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 12, 2025 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O AND/OR THE DEPARTMENT OF BUILDING RECORDS. ILLEGAL CLASS 'A' APARTMENT CREATED AT CELLAR. ILLEGALLY CONVERTED IT FROM A 2 STORY TO A 3 STORY CLASS 'A' APARTMENT. UNL #35483653Y | Sep 18, 2026 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 23, 2025 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS AT CELLAR, VACATE ORDER # 259575 | — |
| Aug 24, 2026 | A | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQFT OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 27, 2026 |
| Aug 24, 2026 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 28, 2026 |
| Jun 20, 2025 | B | § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION CONSISTING OF BUILDING WITH 2 STORY, 3 CLASS ''A'' APARTMENTS IILLEGAL CONVERTER TO 2 STORY, 4 CLASS ''A'' APARTMENTS CONTRARY TO CO #302272127F | Jul 25, 2025 |
| Jun 20, 2025 | B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS WASH BASIN, WATER CLOSET, SHOWER STALL AND RESIDENTIAL SINK AT CELLAR | Jul 25, 2025 |
| Jun 20, 2025 | B | § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, GAS RANGE AT CELLAR | Jul 25, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 24, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQFT OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:18 AM ET. BBL 3039930020.