5 floors · 5 apartments · 6,358 sq ft · built 2018 · class C2 · owner of record: Qzf Management Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 19, 2019 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS AND/OR APPROVED AMENDMENTS @TIME OF INSPECTION THE GAS LINE FOR THE STOVE WERE WHERE THE WATER LINES SHOULD HAVE BEEN FOR THE SINK & VIS-A-VERSA:OPPOSITE OF WHA #35451389H | Jul 24, 2020 DEFAULT | $0 |
| Apr 5, 2019 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARD RAILS. AS NOTED:AT TIME OF MY INSPECTION AT AN ACTIVE 5 STORY BUILDING OBSERVED AT EXPOSURE#3 OPENING OF ABOUT 12'X12". #35408629Y | Jan 13, 2020 IN VIOLATION | $0 |
| Nov 28, 2018 | Construction CLASS - 2 FAILURE TO PROVIDE P.E. APPROVED DESIGN DRAWINGS.AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE.OBSERVED FLOOR #2,3,4 STEEL COLUMN TO COLUMN MOVEMENT CONNECTION,FAILURE TO PROVIDE P.E. APPROVED #35368852N | Jun 24, 2019 DEFAULT | $0 |
| Sep 13, 2018 | Construction CLASS - 1 BC3309.1 FAILURE TO PROTECT ADJACENT PROPERTIES. OBSERVED 5 STY NB AT ROOF LEVEL, WITH EXTERIOR MASONRY OPS ACTIVE, BRICKS WERE BEING INSTALLED AT ROOF LEVEL EXTERIOR WITH NO OVERHEAD PROTECTION IN PLACE FOR AD #35353387P | Apr 3, 2019 IN VIOLATION | $0 |
| Sep 13, 2018 | Construction CLASS - 2 BC3301.2 FAILURE TO INSTITUTE SAFETY MEASURES AT CONSTRUCTION SITE. OBSERVED WORKERS AT ROOF LEVEL INSTALLING PERIMETER BRICKS. WORKERS WERE WEARING HARNESS, BUT WERE NOT TIED OFF TO FDNY FALL ARREST SYSTEM. I #35353388R | Apr 3, 2019 IN VIOLATION | $0 |
| Sep 13, 2018 | Unknown CLASS - 1 NO DOCUMENTS ON SITE, NO DD FOR ELEVATOR SHAFT. OBSERVED WOOD WORKING PLATFORMS IN ELEVATOR SHAFT ON ROOF AND ALSO WOOD PLATFORM AT 1 STY NEAR STAIRS. UPON REQUEST FOR DESIGN DRAWINGS FOR TEMPORARY WOOD PLATFOR #35353389Z | Apr 3, 2019 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 8:12 AM ET. BBL 3008290028.