Manhattan · Block 830 · Lot 44 · 10001

262 5 Avenue

54 floors · 41 apartments · 188,514 sq ft · built 2023 · class D6 · owner of record: Five Points 262 Project Llc

7open violations
$7,524ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 188,514 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 485 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 830). Agency page

Dec 31, 2030
in 1529 days
Next due 2030

Open violations

ECB / OATH (4) · $7,524 owed
IssuedViolationHearingBalance
Mar 2, 2026Construction CLASS - 1
54 STORY NB ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLD PLATFORM 30 FT IN HEIGHT APPROX. 2FT NEXT TO PERSONNEL HOIST W/NO/MISSING OR INADEQUATE OVERHEAD PROTECTION EXP#4 SECTION REMOVED. SITE SAFETY PLANS SHOW HOI
#39551119L
Dec 15, 2026
$2,500
Mar 2, 2026Site Safety CLASS - 1
54 STORY NB ACTIVE SITE.OBSERVED MAKESHIFT TEMPORARY PLATFORM IN PLACE IN UPPER ELEVATOR SHAFT ON 52 FL MADE OUT OF WOOD/PLYWOOD/2X4 TIMBER WOOD UPON REQUEST TO CONTRACTOR DESIGN DRAWINGS.NONE PROVIDED/READILY
#39551121K
Dec 15, 2026
$2,500
Mar 2, 2026Construction CLASS - 1
54 STORY NB ACTIVE SITE.BUILDING HEIGHT APPROXIMATELY 1000 FT. ON 52 FL & ABOVE OBSERVED EXTERIOR VERTICAL NETTING NOT MAINTAINED AS PER SITE SAFETY PLANS/BC CODE 3308.5.OBSERVED NETTING LOOSE WIRE ROPE CABLES
#39551122M
Dec 15, 2026
$2,500
Jun 14, 2024Unknown CLASS - 1
AT THE TIME OF THE INSPECTION FOR THE JOB SITE 57 STORIES, NEW BUILDING, THE GC FAILED TO KEEP ADEQUATE THE SAFETY MEASURES, I OBSERVED ON DIFFERENT FLOORS #57,54, 17,16, AND OTHERS, THAT THE PERMIT HOLDER FAIL
#39529625N
Jul 10, 2025
IN VIOLATION
$24
DOB (2)
IssuedViolationStatus
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#00687
DOB VIOLATION - ACTIVE
Dec 1, 2016ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
#00454
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Sep 15, 2017Elevators EVCAT1
Active
Jan 3, 2017Elevators ACC1
Active
Dec 1, 2016Elevators EVCAT1
Active
Nov 14, 2016Elevators ACC1
Active
Oct 1, 2005Elevators LL1081
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 11:15 PM ET. BBL 1008300044.

Look up another building