4 floors · 176,400 sq ft · built 1903 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2446). Agency page | Dec 31, 2026 in 43 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 176,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 10, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED AT ELECTRICAL ROOM BELOW CEILING OPENINGAPPROX. 24" X 9" IN CMU WALL, NO FIRE PROOFING. REMEDY: PROVIDE/MAINTA #35732205P | May 8, 2026 POP/IN-VIO | $0 |
| Apr 10, 2026 | Construction CLASS - 2 REISSUED ECB #35719917R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SMOKE DOORS NOT SELF-CLOSING AT: 4TH FLOOR STAIR A: 3RD FLOOR STAIRWAY A, B, C: 1ST FLOOR STAIR F; AT 1ST FLOOR BY EXIT #4. #35732204N | May 8, 2026 POP/IN-VIO | $0 |
| Apr 3, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY ILLUMINATED DISCHARGE BOXES NOT OPERATING WHEN TESTED #35727453H | May 8, 2026 POP/IN-VIO | $0 |
| Apr 3, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: CRACKED WIRE MESH GLASS PANELS IN STAIRWELLS FROM 2ND TO 3RD FLOOR STAIR A ANDSTAIR B 3RD FL TO 4TH FL OBSERVED UPON INSPECTION. REMEDY: REPAIR AND/ #35727499N | May 8, 2026 POP/IN-VIO | $0 |
| Apr 3, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING DUE TO BINDING AND/OR FAULTY HARDWARE ON EXIT 3 CELLAR LEVEL AND EXIT 2 EXTERIOR EMERGENCY EXIT DOOR OBSERVED WHEN TESTED UPON IN #35727452X | May 8, 2026 POP/IN-VIO | $0 |
| Apr 3, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF DOOR KICK STOPS ON FIRE RATED/SMOKE DOORS AND CLASSROOMS ON CLASS #35727451Y | May 8, 2026 POP/IN-VIO | $0 |
| Apr 3, 2026 | Construction CLASS - 2 REISSUE ON ECB #35717271H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: IN STAIRWELLS A AND B DUE TO WATER DAMAGE AND/OR WATER LEAKING THROUGH BULKHEAD WALLS/ROOF SPALLING PLASTER OBSERVED UPON #35727498L | May 8, 2026 POP/IN-VIO | $0 |
| Apr 3, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOM AND SMOKE FIRE DOORS NOT SELF-CLOSING PROPERLY DUE TO BINDING MISSING OR FAULTY HARDWARE ON CLASSROOMS 401, 402, 404, 405, 406, #35727450M | May 8, 2026 POP/IN-VIO | $0 |
| May 20, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING PROPERLY AT THE TIME OF INSPECTION.AT THE TIME OF INSPECTION OBSERVED & NOTED AT 4TH FL.STAIRWAY A ONE EXIT DOOR,3 RD FL STAIRWAY C,B,A EACH STAIRWAY ONE EXIT DOOR,AT 1ST FLOOR.STAIR #35719917R | Aug 15, 2025 POP/IN-VIO | $0 |
| May 16, 2025 | Construction CLASS - 2 REISSUE: 35684637P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. INTERIOR WALL AT STAIR "A" "B: 2ND FLOOR AND TOP FLOOR WALLS ARE SPALLING DUE TO WATER DAMAGE. REMEDY: COMPLY WITH CODE. #35717271H | Jul 11, 2025 POP/IN-VIO | $0 |
| Aug 26, 2024 | Unknown CLASS - 2 I OBSERVED INSTALLATION OF LIGHT FIXTURES FOR TEMPORARY SIDEWALK SHED IN FRONT OF MAIN ENTRANCES WITHOUT AN ELECTRICAL PERMIT ON FILE, OBTAIN PERMIT; OBTAIN PERMIT #39123062Z | Aug 30, 2024 POP/IN-VIO | $0 |
| Sep 1, 2020 | Boilers CLASS - 2 DISCHARGE FROM PRESSURE RELIEF VALVE FOR HOT WATER TANK NO. 2 REDUCED-CORROSION ON LWC PIPING-NO SPILL SWITCH INSTALLED ON FLUE SYSTEM FOR HOT WATER BOILER; CORRECT ALL VIOLATING CONDITIONS, SUBMIT A CERTIFICAT #39027887N | Sep 16, 2020 POP/IN-VIO | $0 |
| Aug 31, 2020 | Boilers CLASS - 2 LEAK IN BOILER TUBE-LWC AND WATER COLUMN BLOW DOWNS CORRODED-FUEL OIL SUPPLY GAGE DEFECTIVE-COMBUSTIBLE STORAGE IN BOILER ROOM-PRESSURE RELIEF VALVE ON COLD WATER PIPE FOR HWH PLUGGED; CORRECT ALL VIOLATING CON #39027834J | Sep 3, 2020 POP/IN-VIO | $0 |
| Aug 31, 2020 | Boilers CLASS - 2 LEAK ON LWC PIPING-FEED WATER PIPING LEAK OVER GAS TRAIN-WATER COLUMN BLOW DOWN CORRODED-FUEL OIL GAGE ON SUPPLY PIPING DEFECTIVE; CORRECT ALL VIOLATING CONDITIONS, SUBMIT A CERTIFICATE OF CORRECTION. #39027835L | Sep 3, 2020 POP/IN-VIO | $0 |
| Jul 1, 2019 | Elevators CLASS - 2 16M07,100I10,42B11,99BB07,81H13,05J10,08V10;(16-M)=PROVIDE ON 4TH FL.(100-I)REPAIR HOLE IN RIGHT-SIDE WALL IN MOTOR RM(42-B)PROVIDE READABLEFUSES(99-BB)PROVIDE(81-H)REPAIR(05-J)REPAIR,(08-V)REPAIR. #38270408K | Aug 30, 2019 POP/IN-VIO | $0 |
| Jan 16, 1998 | Elevators Non-Hazardous 30P7,57O2,43Y14,14M7,35U7,21L12. 31-ELECTRIC BOX COVER MISSING ON MOTOR. 30-NO ACCESS TO CAR TOP. #38069074P | Mar 13, 1998 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05719 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07881 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07882 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05718 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05717 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #26980 | DOB VIOLATION - ACTIVE |
| Aug 13, 2020 | ELEVATOR #9028/682491 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #07713 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #07712 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #00225 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #00226 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |