6 floors · 2 apartments · 103,047 sq ft · built 1857 · class O5 · owner of record: Empire 261 Canal Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-14 (Accepted). Agency page | Dec 31, 2026 in 57 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 103,047 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1153 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 209). Agency page | Dec 31, 2029 in 1153 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 5, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISIONER'S ORDER. DOB-FTC #102325PI10203TC, DOB-CONTROL #348325. DATED 10/23/2025. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH COMMISSIONER'S ORDER. #35718943X | Feb 19, 2026 DEFAULT | $12,500 |
| Aug 11, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. BUILDING IS A6 STORY AND CELLAR INTERIOR LOT, MIXED USE BUILDING. OBSERVED AT DETERIORATED MORTAR UNDER THE WATERTABLE ON 2ND FLOOR. OBSERVED SPALLING ST #35719076L | Mar 2, 2027 PENDING | $2,530 |
| Apr 9, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING CODE COMPLIANT. NOTED: APPROXIMATELY 10 FOOT BY 18-FOOT-HIGH SECTION OF TERRACOTTA WALL HAS BECOME DISLODGED AND DISPLACED. THIS IS THE REAR SECTION OF THE ROOF MOUNTED SPRINKLER TA #39144454K | Sep 24, 2026 DEFAULT | $12,530 |
| Apr 5, 2024 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THE ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENTS RECORDS. APPLICATION 102352133 , INDICATES 2 THRU 4 FLOOR TO BE OCCUPIED AS FACTORY AND LIVING / WORKING SUITS . AT TIME #39110859N | May 15, 2025 IN VIOLATION | $0 |
| Sep 29, 2008 | Zoning CLASS - 2 FAILURE TO COMPLY WITH USES LOCATED COMPLETELY WITHIN AN ENCLOSED BLDG NOTE:LOCATED IN 2 MI56 ZONING DISTRICT EXIST MULTIPLE GROUND LEVEL STORES WITH MERCHANDISE BEING LOCATED ON OR ABOVE PUBLIC SIDEWALKS INCL #34686151H | Nov 20, 2008 IN VIOLATION | $0 |
| Jun 24, 2008 | Construction Non-Hazardous ALTERED BLDG OCCUPIED W/O A VALID C OF O. UNDER ALT # 102352133 NO C/O WAS ISSUED & ENTIRE BLDG IS OCCUPIED. REMEDY: OBTAIN A VALID C OF O. #34662575P | Aug 28, 2008 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #00798 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00010 | DOB VIOLATION - ACTIVE |
| Oct 23, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#347825 VIO#081125PI10201SB DATED 8/11/25 REQURING OWNET TP PROVIDE A CORRECTIVE ACTION PLAN BY 9/11/25 & START BLDG REPRS UNDER PERMIT BY 10/11/25 AS OF 10/23/25 A CAP AND EVIDENCE WAS NOT REC'D. IMMED COMPLY W/COMSSIONER'S ORDER CONTROL# 347825 VIO#081125PI10201SB #PI10203TC | DOB VIOLATION - ACTIVE |
| Aug 11, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 CRACKED WINDOW SILL ON THE 2FL & DETERIORATED MORTAR UNDER THE WATERTABLE ON 2FL. OBSVD SPALLING STUCCO @ EXP3&4. OBSVD A MSONRY CRACK @ INTERIOR WALL @ BSMT.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO SUBMIT A CORRECTIVE ACTION PLAN #PI10201SB | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00010 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #00848 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01504 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00349 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02742 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03875 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01548 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #03936 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #02792 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00338 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01220 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00073 | DOB VIOLATION - ACTIVE |
| Mar 8, 2001 | LOCAL LAW 10/81 - ELEVATOR #00179 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 11:42 AM ET. BBL 1002090028.