Manhattan · Block 1870 · Lot 7502 · 10025

2600 Broadway

12 floors · 96 apartments · 150,289 sq ft · built 1911 · class RM · owner of record: Name Not On File

47open violations
$1,250ECB/OATH penalties owed
5HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 150,289 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $318,750 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 486 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1870). Agency page

Dec 31, 2030
in 1530 days
Next due 2030
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-23 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $1,250 owed
IssuedViolationHearingBalance
Jul 12, 2024Construction CLASS - 2
OBSERVED ON THE GROUND FLOOR AND BASEMENT IN PETQUA ANIMAL FACILITY NO SPRINKLER SYSTEM IN PLACE NO SMOKE ALARM IN PLACE WHICH IS CONTRARY TO CODE SECTION BC 903.2.2.2; BC 903.2.2.2, COMPLY WITH CODE
#39119024X
Oct 20, 2026
PENDING
$1,250
Apr 19, 2024Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:ATTIME OF INSPECTION OBSERVED CONDITIONS AT EXPOSURE#3 AND #4 CONDITIONSARE SPALLING STUCCO/CRACKED/PEALING WATER DAMAGED AT TOP OF PARAPET WA
#35682392R
Mar 18, 2025
IN VIOLATION
$0
Aug 4, 2020Construction CLASS - 1
FAILURE TO EXTERIOR BUILDING CODE COMPLIANT NOTED AT THE RIGHT SIDE ALONG WEST 98 ST THE DECORATIEV METAL CORNICE HAS BECOME DISLODGE WITH SEVERAL SUPPORT MEMEBERS FALLEN SIDEWALK SHED AND STREET BELOW THE REMA
#35454021N
Aug 12, 2021
IN VIOLATION
$0
DOB (6)
IssuedViolationStatus
Jun 26, 2024FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00038
DOB VIOLATION - ACTIVE
Nov 10, 2021CONSTRUCTION
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 322185(2320LL10702OS) IISUED ON 02/03/2020. AS OF 11/10/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONERS ORDERS
#LLFA01SR
DOB VIOLATION - ACTIVE
Jun 9, 2021CONSTRUCTION
FAILURE TO COMPLY. ON 09/17/2020 COMMISSIONER'S ORDER 349463 (091720CLLFA01RF)WAS ISSUED TO OWNER TO HAVE ENTIRE CORNICE 100% INSPECTED BY A NYS LIC PROF ENG'R. AS OF 06/09/2021 OWNER HAS NOT COMPLIED W/IMMED CURE ORDER TO HAVE ENTIRE CORNICE INSPECTED & PROVIDE REPORT & REPAIR PROPOSAL & PERMIT. RE
#LL0701SR
DOB VIOLATION - ACTIVE
Sep 17, 2020CONSTRUCTION
DEFECTIVE, LOOSE HANGING,MISSING SECTIONS OF METAL CORNICE ON SOUTH AND WEST EXPOSURES PRESENT A POTENTIAL HAZARD TO PUBLIC. REMEDY: OWNER TO IMMED RETAIN A NYS LIC PE TO EVALUATE AND PERFORM A 100% HANDS ON INSPECTION OF THE ENTIRE CORNICE, PRODUCE AND PROVIDE A REPORT AND REPAIR PROPOSAL AND PERMI
#LLFA01RF
DOB VIOLATION - ACTIVE
Sep 17, 2020CONSTRUCTION
UNLAWFUL ACTS, FAILURE TO COMPLY WITH COMMISSIONERS ORDER REMEDY: COMPLY WITH COMMISSIONERS ORDER
#LLFA02RF
DOB VIOLATION - ACTIVE
Aug 4, 2020CONSTRUCTION
.A SECTION OF METAL CORNICE ON THE 12TH FLOOR HAS BACOME DISLODGED WITH SUPPORT DEBIRS AND METAL SECTION FALLING TO STREET
#CNE02EC
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Jun 26, 2024AEUHAZ FTC-AEU-HAZ
Active
Sep 1, 1994Boiler LL6291
Active
Sep 1, 1994Boiler LL6291
Active
HPD (32) · C 5 · B 19 · A 8
IssuedClassViolationCorrect by
Sep 4, 2025BApt 12F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 9, 2025
Sep 4, 2025BApt 12F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 9, 2025
Sep 4, 2025BApt 12F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 9, 2025
Aug 6, 2025A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYNov 9, 2025
Aug 6, 2025BApt 3B · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 10, 2025
Aug 6, 2025BApt 3B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 10, 2025
Aug 6, 2025AApt 3B · § 27-2005 ADM CODE REFIT DOORS AT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 9, 2025
Aug 6, 2025A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTICAL TILE DROP CEILING CELLAR THROUGHOUT.Nov 9, 2025
Aug 6, 2025AApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 9, 2025
Aug 14, 2024BApt 12F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM WEST AT NORTHSep 18, 2024
Aug 14, 2024BApt 12F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM WEST AT NORTHSep 18, 2024
Nov 4, 2022BApt 1F · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTHDec 9, 2022
Jun 1, 2022CApt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 27, 2022
Aug 19, 2020CApt 12F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 12F, 12th STORY, 2nd APARTMENT FROM WEST AT NORTHSep 14, 2020
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS AT WATER CLOSET COMPARTMENT IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016AApt 3B · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE THE WOOD MOLDING AT EAST WALL IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTAug 5, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SINK CABINET IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS AT THE WATER CLOSET COMPARTMENT IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016AApt 3B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTAug 5, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
May 2, 2016BApt 3B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD DRAWERS AT BASE CABINET IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT EASTJun 6, 2016
Jun 26, 2008BApt 10C · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS 10TH STY CENTER SOUTH APT 10C WEST BATHROOM. , SECTION '' ''Jul 31, 2008
Jun 26, 2008AApt 10C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING PRIVATE HALL 10 STY 2 FROM EAST AT SOUTH APT 10C. , SECTION '' ''Sep 29, 2008
May 3, 1994CApt 8C · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING NROTHWEST AND SOUTHWEST ROOM 8 STY NORTH APT 8C MS HOLMAN 864-2302 ER1 94011615. , SECTION '' ''May 23, 1994
May 3, 1994CApt 8C · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING AT WEST PRIVATE HALL CLOSET 8 STY NORTH APT 8C ER1 94011615. , SECTION '' ''May 23, 1994
Aug 25, 1992CApt 8C · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING 8 STY NORTHEAST APT 8C NORTH ROOM HOLMAN 864-2302 ER1. , SECTION '' ''Sep 14, 1992
Apr 21, 1992AApt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL & CEILING SOUTHEAST BATHROOM 3 STY SOUTHWEST APT 3A. LOCATED AT APT 3AAug 7, 1992

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 8:48 PM ET. BBL 1018707502.

Look up another building