Manhattan · Block 1931 · Lot 56 · 10027

260 West 126 Street

2 floors · 7,494 sq ft · built 1910 · class M1 · owner of record: Thomas Memorial Wesleyan Methodist Church

19open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-08-17 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (10)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#04239
DOB VIOLATION - ACTIVE
Oct 29, 2024CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE.
#24-02848
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#04152
DOB VIOLATION - ACTIVE
Jul 18, 2022CONSTRUCTION
BOROUGH COMMISSIONER HAS ISSUED A SWO FOR APP #M00666173 DUE TO SITE SAFETY MANAGER WITHDRAWAL.
#22-02257
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#07111
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#09332
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#05120
DOB VIOLATION - ACTIVE
Mar 18, 1994LOCAL LAW 62/91 - BOILERS

#06719
DOB VIOLATION - ACTIVE
Mar 18, 1993LOCAL LAW 62/91 - BOILERS

#06719
DOB VIOLATION - ACTIVE
Mar 12, 1990PUBLIC ASSEMBLY

#02FB01
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Mar 26, 2025Structurally Compromised Buildings FTF-SC-INITL
Report due for structurally compromised property
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Feb 7, 2000Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Mar 18, 1994Boiler LL6291
Active
Mar 18, 1993Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 2:55 PM ET. BBL 1019310056.

Look up another building