8 floors · 32 apartments · 39,106 sq ft · built 2006 · class R4 · owner of record: The 260-262 Skillman Street Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,106 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $198,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 850 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 2, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES.NOTE:OBSERVED CRACKS AT PARAPET WALL AT ROOF LEVEL ON BOTH SIDE OF WALL. REMEDY:MAINTAIN EXTERIOR FACADES TAKE SAFETY MEASURES & REPAIR DAMAGE FACADE #35679659J | Sep 12, 2024 IN VIOLATION | $625 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#814181.AGG1 PRIOR NOV#37018685H UNDER 2 #37023053X | Jun 26, 2023 IN VIOLATION | $3,125 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#814181. REMEDY: SUBMIT ACCEPTABLE REQUIRE #37018685H | Dec 30, 2020 IN VIOLATION | $1,250 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#814182. REMEDY:SUBMIT ACCEPTABLE REQUIR #37018684X | Dec 30, 2020 IN VIOLATION | $625 |
| Oct 31, 2018 | Elevators CLASS - 1 05M07,05L10,16B01,75M07,02X10,52B14,39Q03,40R09. 05M07-PROVIDE DOOR ZONE RESTRICTOR; 05L10-ADJUST ELEVATOR DOOR (); REOPENS TEN TIMES BEFORE CLOSING; 16B01-TOO LARGE GAP BETWEEN DOOR PARTIES; BSMT, 8TH FLOOR #38265199R | May 6, 2019 IN VIOLATION | $1,250 |
| Dec 29, 2014 | Construction CLASS - 2 WORK W/O A PERMIT.WORK NOTED:AT ROOF LEVEL ERECTED FULL HEIGHT PARTITIONS FOR 2 ROOMS AND AT BATHROOM.INSTALLED WATER AND WASTE LINES FOR 2 RESIDENTIAL SINKS AND A 3PC BATHROOM (TOILET,SINK,TUB) AND A WASHING #35035725P | Mar 30, 2015 WRITTEN OFF | $0 |
| Dec 29, 2014 | Quality of Life CLASS - 2 RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES.COFO #301542178F INDICATES PREMISES TO BE LEGALLY APPROVED FOR 16 FAMILIES 1ST-8TH FLRS;2-FAMILIES EACH)CELLA #35035726R | Apr 2, 2015 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911733 | DOB VIOLATION - ACTIVE |
| Nov 4, 2021 | ELEVATOR #9027/710719 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #07413 | DOB VIOLATION - ACTIVE |
| Sep 15, 2017 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST #03854 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #02248 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| May 20, 2019 | Elevators EVCAT5 | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Sep 15, 2017 | Elevators EVCAT1 | Active |
| Sep 15, 2017 | Elevators EVCAT1 | Active |
| Jun 1, 2016 | Elevators EVCAT5 | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| Oct 1, 2012 | Elevators EVCAT1 | Active |
| Aug 15, 2012 | Elevators ACC1 | Active |
| Feb 27, 2009 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 14, 2022 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1ST BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, APARTMENT AT NORTH | May 19, 2022 |
| Apr 14, 2022 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1ST ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, APARTMENT AT NORTH | Jul 18, 2022 |
| Apr 14, 2022 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1ST ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, APARTMENT AT NORTH | May 19, 2022 |
| Apr 14, 2022 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT CEILING IN THE 1ST BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, APARTMENT AT NORTH | May 19, 2022 |
| Apr 14, 2022 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, APARTMENT AT NORTH | May 19, 2022 |
| Sep 3, 2020 | A | Apt 6A · § 27-2005 ADM CODE REFIT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 6A, 6th STORY, APARTMENT AT WEST | Dec 7, 2020 |
| Mar 20, 2020 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2020 |
| Mar 20, 2020 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2020 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 11:38 PM ET. BBL 3019417501.