Brooklyn · Block 1793 · Lot 21 · 11216

260 Clifton Place

2 floors · 2 apartments · 4,216 sq ft · built 1899 · class B3 · owner of record: Prestige Clifton Brownstone 260 Corp

2open violations
$30,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
307dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01

Open violations

ECB / OATH (9) · $30,125 owed
IssuedViolationHearingBalance
Jul 30, 2025Construction CLASS - 2
AS PER SECTION 2113.1.5.1 OF THE 2022 NYC BUILDING CODE. FAILURE TO ALTER THE ADJOINING BUILDINGS 'PREVIOUSLY CONSTRUCTED CHIMNEY (262 CLIFTON PL)TO CONFORM WITH THE REQUIREMENTS OF THIS CODE. CURRENT EXTENSION
#39155416N
Nov 23, 2026
PENDING
$1,250
Jun 4, 2025Construction CLASS - 3
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED THE STAINLESS-STEEL CHIMNEY PIPE CONNECTION FOR 262 NOT PROPERLY CONNECTED. A SIGN WAS USED AT THE FRONT AND THERE
#39149959Z
Mar 2, 2026
IN VIOLATION
$0
Feb 2, 2023Construction CLASS - 1
AT TIME OF RESPONDING COMPLAINT OBSERVED: WORK CONTRARY TO APPROVED DRAWINGS. COLD FORM STEEL FRAME WAS INSTALLED ON ADJOINING PROPERTY AT CENTER SECTION 18 FEET APPROXIMATELY, NO REFLECTING ON DRAWINGS, EXPO#
#39512585R
Oct 20, 2023
IN VIOLATION
$2,000
Dec 20, 2022Construction CLASS - 1
IN RESPONSE TO COMPLAINT OBSERVED ACTIVE CONSTRUCTION SITE WITH EXP 2 ADJOINING PROPERTY CHIMNEY COVERED WITH PLASTIC MATERIAL WHICH CREATED HAZARDOUS CONDITION FOR EXP 2 NEIGHBOR AND SET HER CARBON MONOXIDE DE
#39510619R
Oct 24, 2023
IN VIOLATION
$2,500
Dec 20, 2022Construction CLASS - 1
AT THE TIME OF INSPECTION OF ACTIVE CONSTRUCTION SITE OBSERVED NO WINDOW PROTECTION AT EXP 4. VIOLATION FOR THE SAME CONDITION WAS PREVIOUSLY ISSUED ON 9/22/22 BY INSPECTOR #3188 UNDER COMPLAINT #3874845 AND ST
#39510618P
Oct 24, 2023
IN VIOLATION
$6,250
Sep 22, 2022Construction CLASS - 1
AT THE TIME OF INSPECTION I OBSERVED A 3 STORY BUILDING WITH VERTICAL FRAMING FOR AN ADDITIONAL STORY. THERE WAS NO SIDEWALK SHED AT EXPOSURE 1 AS PER CODE. THIS CREATES A HAZARD FOR THE PUBLIC AND PROPERTY.STO
#39506660R
Oct 20, 2023
IN VIOLATION
$10,000
Sep 22, 2022Construction CLASS - 1
AT THE TIME OF INSPECTION I OBSERVED A 3 STORY BUILDING WITH VERTICAL FRAMING FOR AN ADDITIONAL STORY, CHIMNEY OF ADJOINING PROPERTY AT EXPOSURE 2 WAS NOT RAISED ABOVE HEIGHT OF VERTICAL ADDITION AS PER CODE. T
#39506668L
Apr 1, 2024
IN VIOLATION
$2,500
Sep 21, 2022Construction CLASS - 1
AT TIME OF INSPECTION OF AN ACTIVE JOB SITE WITH INTERNAL OPERATIONS , I OBSERVED THAT THERE WERE NO ROOF PROTECTION PROVIDED FOR PROPERTY AT EXPOSURE 2 AS REQUIRED.STOP ALL WORK ABOVE 2ND FLOOR ,PROVIDE ROOF P
#39506639M
Oct 20, 2023
IN VIOLATION
$2,500
May 21, 2021Construction CLASS - 1
AT TIME OF INSPECTION, ROOF AND REAR WINDOWS OF PREMISES OPEN TO THE ELEMENTS, CAUSING RAIN RUNOFF TO ADJACENT OCCUPIED PREMISES, 262 CLIFTON PLACE, REPAIR AND/REPLACE; SEAL AND WATERPROOF BUILDING
#39041548J
Sep 22, 2021
DEFAULT
$3,125
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 4:03 PM ET. BBL 3017930021.

Look up another building