Queens · Block 268 · Lot 11 · 11101

26-04 Jackson Avenue

14 floors · 82 apartments · 70,238 sq ft · built 2024 · class D6 · owner of record: P Plus M Llc

1open violations
$5,625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
61dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 61 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 77 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 70,238 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 305 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 478 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 268). Agency page

Dec 31, 2028
in 792 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1157 days
Next cycle year 2029

Open violations

ECB / OATH (3) · $5,625 owed
IssuedViolationHearingBalance
May 31, 2022Construction CLASS - 1
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARDRAILS.NOTED:AT TIME OF INSPECTION OF 3 STORY DEMOLITION WORK IN PROGRESS APROX 8 WORKERS ON SITE OBSERVED ENTERING BUILD
#35653062L
Nov 1, 2022
IN VIOLATION
$2,500
May 31, 2022Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.NOTED:AT TIME OF INSPECTION OF 3 STORY DEMOLITION WORK IN PROGRESS AT 3RD FLOOR APROX 8 WORKERS ON SITE OBSERVED APPROVED DEMO
#35653060H
Nov 1, 2022
IN VIOLATION
$625
May 31, 2022Construction CLASS - 1
FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO COMMENCEMENT OF DEMOLITION.NOTED:AT TIME OF INSPECTION OF 3 STORY DEMOLITION WORK IN PROGRESS AT 3RD FLOOR LEVEL APROX 8 WORKERS ON SITE I WAS INFORMED BY MY SU
#35653063N
Jan 17, 2023
IN VIOLATION
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Aug 31, 2026BApt 12G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 12G, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''Oct 5, 2026

Issued in the last 120 days

DateSourceWhatNow
Aug 31, 2026HPD BHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 12G, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 1:49 PM ET. BBL 4002680011.