2 floors · 3 apartments · 3,147 sq ft · built 1915 · class C0 · owner of record: Phantom Capital Rentals Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1158 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 31, 2023 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: (1) AT BSMT - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A (3) PC BTHRM (TOILET, SINK, TUB). (2) AT 1ST FLR - WATER & WASTE LINES INSTALLED FOR RESIDENTIAL SINK AT KITCHEN AREA. #35489085M | May 10, 2024 IN VIOLATION | $0 |
| Oct 31, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: (1) AT CELLAR - OBSERVED COMBUSTIBLE MATERIAL STORED IN BOILER RM CONSISTING OF PAINT CAN, CLEANING MATERIAL, PLASTIC, CLOTH & WOOD ITEMS. (2) AT 1S #35489086Y | May 10, 2024 IN VIOLATION | $0 |
| Oct 31, 2023 | Unknown CLASS - 1 RESIDENCE CONVERTED, MAINTAINED, OR OCCUPIED AS DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES - LEGAL TWO-FAMILY DWELLING CONVERTED TO A FOUR-FAMILY DWELLING. NOTED: DOB RECORDS INDICATES A (2) #35489083Z | May 10, 2024 IN VIOLATION | $0 |
| Oct 31, 2023 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NOTED: AT CELLAR- FULL HEIGHT PARITITON WALLS ERECTED AT VARIOUS LOCATIONS TO CREATE A BTHRM & (2) BDRMS. WATER & WASTE LINES INSTALLED FOR (3) PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL S #35489084K | May 10, 2024 IN VIOLATION | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 5:04 AM ET. BBL 2032930173.