Bronx · Block 3293 · Lot 146 · 10458

2595 Briggs Avenue

5 floors · 10 apartments · 13,815 sq ft · built 1922 · class C1 · owner of record: 2595 Briggs Avenue Llc

27open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
64dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 308 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (27) · C 1 · B 22 · A 4
IssuedClassViolationCorrect by
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026CApt 5N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW IN THE 4th ROOM FROM NORTH LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHSep 14, 2026
Sep 8, 2026BApt 5N · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED LESS THAN 30 SQUARE FEET AT CEILING EAST AND WEST WALL IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026AApt 5N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHDec 12, 2026
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
Sep 8, 2026BApt 5N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOct 13, 2026
May 2, 2008BApt 2N · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTJun 6, 2008
May 2, 2008BApt 2N · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTJun 6, 2008
May 2, 2008BApt 2N · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTJun 6, 2008
May 2, 2008BApt 2N · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTJun 6, 2008
Sep 5, 2007BApt 1N · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN RATS IN THE ENTIRE APARTMENT LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM WEST AT NORTHOct 10, 2007
Sep 5, 2007BApt 1N · SECTION 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE .. IN THE 2nd ROOM FROM EAST LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM WEST AT NORTHOct 10, 2007
Sep 5, 2007BApt 1N · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM WEST AT NORTHOct 10, 2007
Sep 5, 2007AApt 1N · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST DOOR FRAME IN THE 3rd ROOM FROM EAST LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM WEST AT NORTHDec 9, 2007
Sep 5, 2007AApt B · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ROOM CREATED, NO WINDOW IN THE 3rd ROOM FROM NORTH LOCATED AT BSMT-APT BDec 9, 2007
Sep 5, 2007AApt 1N · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST DOOR FRAME IN THE 4th ROOM FROM EAST LOCATED AT APT 1N, 1st STORY, 1st APARTMENT FROM WEST AT NORTHDec 9, 2007
Sep 5, 2007BSECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF MILDEW AT NORTH & EAST WALLS NORTHEAST ROOM WEST BSMT APT.Oct 10, 2007
Sep 5, 2007BSECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONDENSATION AT COLD WATER SUPPLY LINE CLG KITCHEN WEST BSMT APT.Oct 10, 2007
Sep 5, 2007BApt 1N · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN FLEAS IN THE ENTIRE APARTMENT LOCATED AT APT 1N, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 10, 2007

Issued in the last 120 days

DateSourceWhatNow
Sep 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW IN THE 4th ROOM FROM NORTH LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED LESS THAN 30 SQUARE FEET AT CEILING EAST AND WEST WALL IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Sep 8, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING IN THE KITCHEN LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 10:22 AM ET. BBL 2032930146.

Look up another building