2 floors · 2,970 sq ft · built 1920 · class M1 · owner of record: Trinity Ame Church
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF A 2-STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE, DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRST RE #39559452L | Dec 3, 2026 PENDING | $1,250 |
| Sep 22, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING, THE SIDEWALK SHED AT EXPOSURE #1-4 WAS NOT MAINTAINED AS REQUIRED BY BC 3307.6.4.10 THE VERTICAL POST WAS NOT PROPERLY SEATED ON A SOLID BASE PLATE/MUDSILL. TH #39559454P | Dec 3, 2026 PENDING | $2,400 |
| Jan 5, 2026 | Construction CLASS - 1 AT TIME INSPECTION OBSERVED THAT BUILDING STRUCTURE IS IN DISREPAIR, MANY CRACKS ON FACADE EXPOSURE #1 ALSO N1 ENGINEERING REPORT WAS ASKED ON 04/01/2022 AS PER COMPLAINT #1596608 OWNER DID NOT REPAIRED AND ENG #39172386X | Mar 12, 2026 DEFAULT | $12,500 |
| Oct 3, 2025 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. IN DOB VIOLATION 316534 DATED IN 4/01/2022 RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF #39162489J | Dec 11, 2025 IN VIOLATION | $6,250 |
| Oct 3, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. FACADE AT EXPOSURE 1 & 4 IN DISREPAIR, CEMENT STUCCO IS LOOSE ALSO HORIZONTAL AND VERTICAL CRACKS AT EXPOSURE 1., REPAIR AND/REPLACE #39162490R | Dec 11, 2025 IN VIOLATION | $5,000 |
| Aug 18, 2025 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION 316534 DATED 4/1/2022. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF #39157490K | Oct 23, 2025 IN VIOLATION | $6,250 |
| Aug 18, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED EXTERIOR FACADE WALL AT EXP 1 & 4 IN STATE OF DISREPAIR. CONDITIONS WITH CEMENT STUCCO LOOSE AND FALLING, HORIZONTAL AND VE #39157489N | Oct 23, 2025 IN VIOLATION | $5,000 |
| Aug 11, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION OF 2 STORY BUILDING OBSERVED SIDEWALK SHED IN PLACE WITH PERMIT M00713841 EXPIRED 4-8-2023 CAUSING HAZARDOUS CONDITIONS. #39543524P | Oct 8, 2026 IN VIOLATION | $1,250 |
| Apr 1, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TIME OFINSPECTION OBSERVED EXTERIOR MASONRY FACADE WALL INSTATE ON DISREPAIR CONDITIONS WITH CEMENT STUCCO LOOSE AND FALLING ONTO SCHOOL PLAY GROUN #35581960N | Jul 7, 2022 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 24, 2023 | CONSTRUCTION FTM.FULL VACATE.2 STORY EXP1 PARAPET AT 1/4 CRNR W/SEVERCRCK WRAPPED AROUND EXP1&4 W/EXP1 PRTLLY DETACHED&BULGING,POSING ARISK TO PUBLIC& ADJ PS154 SCHOOL YRD.EXP1&EXP4 STUCCO CRCKD@VARIOUS LCN.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER#341044(012723FEU11001PN)DATED JANUARY 27,2023 #FEU11001PN | DOB VIOLATION - ACTIVE |
| Feb 2, 2023 | UNSAFE BUILDINGS #1002/2023 | DOB VIOLATION - ACTIVE |
| Jan 27, 2023 | CONSTRUCTION FTM.FULL VACATE.2 STORY EXP1 PARAPET AT 1/4 CRNR W/SEVERE CRCK AROUND EXP1&4 W/ EXP1 PRTLLY DETACHED&BULGING,POSING A RISK TO PUBLIC&ADJ PS154 SCHOOL YRD.EXP1&EXP4 STUCCO CRCKD@VARIOUS LCN. FULLY VACATE PROPERTY.OWNR TO RETAIN NYS PE TO EVAL ENT BLDG&REPAIR BLDG UNDR PRMT SRTING BY 3/1/23& BE CMPLTD #FEU11001PN | DOB VIOLATION - ACTIVE |
| Apr 4, 2022 | IMMEDIATE EMERGENCY ERECT SIDEWALK SHED APPROXIMATELY 20 LINEAR FEET ON EXPOSURE#1 AND 50 LINEAR FEET ON EXPOSURE #4 TO SAFEGUARD PUBLIC AND PROPERTY #16770 | DOB VIOLATION - ACTIVE |
| Apr 1, 2022 | CONSTRUCTION .FAILURE TO MAAINTAIN BUILDING IN CODE COMPLAINT MANNER. AT TIME OF IN SPECTION OBSERVED CEMENT STUCCO DEBRIS FALLING FROM EXTRIOR FACADE AT EXP# 4 ON TO SCHOOL PLAY GROUNG. ALSO REMAINING STUCCO LOOSE & FALLING CONDITION AND STRUCTURAL CRACKS ON FACADE AT EXP. # 4 & 1 #CER02MA | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF A 2-STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE, DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRST RE | Open |
| Sep 22, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF THE 2-STORY BUILDING, THE SIDEWALK SHED AT EXPOSURE #1-4 WAS NOT MAINTAINED AS REQUIRED BY BC 3307.6.4.10 THE VERTICAL POST WAS NOT PROPERLY SEATED ON A SOLID BASE PLATE/MUDSILL. TH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 6:31 AM ET. BBL 1019320009.