6 floors · 20 apartments · 27,000 sq ft · built 1930 · class D7 · owner of record: Rutledge Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-26 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 27,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 22, 2025 | Elevators CLASS - 2 MISALINGED CAB MIRROR. INOPERATIVE CAR PHONE. REPLACE WORN GIBS WHERE NEEDED. SECURE GIBS WHERE NNEDED. PROVIDE EXPLICITLY DETAILED INFO ON HOW/WHERE TO OBTAIN KEYS TO MACHINE ROOM. #39171115J | Feb 8, 2027 DEFAULT | $3,125 |
| Jun 20, 2017 | Local Law CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000002607 HAS BEEN INSPECTED,TESTED & DISINFECTED & THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED & IMPLEMENTED BY 11/1/2016. REM: FILE ANNUAL CERTIFICATION #37003381R | May 14, 2018 IN VIOLATION | $0 |
| Jun 29, 2009 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR ALT 2. JOB #310163435 OF WHICH PERMIT EXPIRED 5.1.09AND APPLICANT OF RECORD IS REQUESTING A LETTER OF COMPLETION VIA PW7 #34774129L | Mar 8, 2010 IN VIOLATION | $0 |
| Jun 29, 2009 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.NOTED: THE CURRENT C OF O FOR THIS 5 STY BLDG C OF O #301568177 INDICATES THAT 1ST FLR HAS ACCESSORY PARKING FOR TEN CARS FOUND AREA #34774130Z | Aug 24, 2009 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #10068 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #25835 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #15975 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #00134 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | PRIVATE RESIDENTIAL ELEVATOR 2012 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS) #00335 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| May 20, 2019 | Elevators JVCAT5 | Active |
| Nov 14, 2016 | Elevators ACJ1 | Active |
| Mar 31, 2014 | Elevators JVIOS | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 2, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 6, 2026 |
| Oct 2, 2026 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 6, 2026 |
| Oct 2, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 6, 2026 |
| Oct 2, 2026 | A | Apt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT OBSERVED AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Jan 5, 2027 |
| Aug 24, 2026 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | Nov 27, 2026 |
| Aug 24, 2026 | C | Apt 6B · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS AT RANGE IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 30, 2026 |
| Aug 24, 2026 | C | Apt 6B · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT ALL PLUMBING FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 30, 2026 |
| Aug 24, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM NO ACCESS TO BOILER ROOM AT BOILER ROOM | Aug 30, 2026 |
| Aug 24, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 28, 2026 |
| Aug 24, 2026 | A | Apt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT SOUTH AND WEST WALL IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 27, 2026 |
| Aug 24, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL STAIRS, 6th STORY | Sep 19, 2026 |
| Aug 24, 2026 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 28, 2026 |
| Aug 24, 2026 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 28, 2026 |
| Aug 24, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND ALL CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 27, 2026 |
| Aug 24, 2026 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS SIGNAGE MISSING | Nov 27, 2026 |
| Aug 24, 2026 | A | Apt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 27, 2026 |
| Aug 24, 2026 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Nov 27, 2026 |
| Aug 21, 2026 | C | Apt 6B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 20, 2026 |
| Aug 17, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 1ST STORY PUBLIC HALL LEADING TO BASEMENT AT BOILER ROOM, 1st STORY | Aug 23, 2026 |
| Aug 17, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 1ST STORY PUBLIC HALL LEADING TO BASEMENT. AT BOILER ROOM, 1st STORY | Aug 23, 2026 |
| Jul 21, 2026 | C | Apt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Jul 27, 2026 |
| Jul 21, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 24, 2026 |
| Jul 21, 2026 | B | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 25, 2026 |
| Jul 21, 2026 | C | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Jul 27, 2026 |
| Jul 21, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 16, 2026 |
| Jul 21, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 16, 2026 |
| Jul 21, 2026 | C | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Jul 27, 2026 |
| Mar 30, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 3rd STORY | Apr 25, 2026 |
| Feb 19, 2026 | C | § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR FIRE DOOR (B) AT PUBLIC HALL STAIRS, 2nd STORY | Feb 25, 2026 |
| Feb 19, 2026 | C | § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR AT FIRE DOOR (A) AT PUBLIC HALL STAIRS, 2nd STORY | Feb 25, 2026 |
| Feb 19, 2026 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
| Feb 19, 2026 | C | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 25, 2026 |
| Feb 19, 2026 | C | Apt 6B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 25, 2026 |
| Feb 19, 2026 | C | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 25, 2026 |
| Feb 19, 2026 | C | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 25, 2026 |
| Jan 26, 2023 | B | Apt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2SQ.FT AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 15392705 ISSUED 27-SEP-22 HAS BEEN UPGRADED TO CLASS B PER ADMIN | Mar 2, 2023 |
| Jan 26, 2023 | B | Apt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2SQ.FT AROUND WINDOW RECESS AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 15392704 ISSUED 27-SEP-22 HAS BEEN UPGRADED | Mar 2, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Oct 2, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Oct 2, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Oct 2, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT OBSERVED AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | Open |
| Aug 24, 2026 | HPD C | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS AT RANGE IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD C | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT ALL PLUMBING FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM NO ACCESS TO BOILER ROOM AT BOILER ROOM | Open |
| Aug 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT SOUTH AND WEST WALL IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL STAIRS, 6th STORY | Open |
| Aug 24, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND ALL CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS SIGNAGE MISSING | Open |
| Aug 24, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 24, 2026 | HPD A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Open |
| Aug 21, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Aug 17, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 1ST STORY PUBLIC HALL LEADING TO BASEMENT AT BOILER ROOM, 1st STORY | Open |
| Aug 17, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed |
| Aug 17, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed |
| Aug 17, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed |
| Aug 17, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 1ST STORY PUBLIC HALL LEADING TO BASEMENT. AT BOILER ROOM, 1st STORY | Open |
| Jul 21, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Jul 21, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 12:05 AM ET. BBL 3030630017.