1 floors · 2,065 sq ft · built 1929 · class K7 · owner of record: Bh Bx Yh Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-23 (Accepted). Agency page | Dec 31, 2026 in 58 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 29, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NO PERMITS ON FILE FOR WORK DONE, ELECTRICAL AND CONSTRUCTION, SECTION OF WALL CUT DOWN ON 1ST FLOOR, AND ELECTRICAL WIRING BEING CUT OUT ON 1ST FLOOR AND CELLAR LEVEL. REMEDY: OBTAIN PER #35721602P | Jun 5, 2026 IN VIOLATION | $12,500 |
| Mar 29, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NO PERMITS ON FILE FOR PLUMBING WORK BEING DONEALONG WITH WORK ON GAS LINES AND BOILER IN CELLAR LEVEL. WORKER CUT INTO LIVE GAS LINE, CUT OUT WATER MAIN AND BOILER TAKEN APART. REMEDY: O #35721603R | Jun 5, 2026 IN VIOLATION | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #02825 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 9, 1994 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 5:45 AM ET. BBL 2032750043.