5 floors · 43 apartments · 39,425 sq ft · built 1918 · class C1 · owner of record: Creston Ave Properties Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,425 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN. I OBSERVED THE BRICK FACADE AT EXPOSURE #1 AND EXPOSURE #2 WITH EVIDENCE OF STEP CRACKS, VERTICAL AND HORIZONTAL CRACKS AND MISSING MORTAR THROUGHOUT. THESE CONDITIONS HAVE THE POTENTIAL OF #39205795P | Dec 4, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 28, 2026 | IMMEDIATE EMERGENCY REMEDY: ERECT APPROXIMATELY 92 LINEAR FEET OF SIDEWALK SHED AT AT EXPOSURE #1 WITH A CATCHALL AT BOTH ENDS AND APPROXIMATELY 27 LINEAR FEET OF SIDEWALK SHED LEADING INTO THE FRONT ENTRANCE ERECT APPROXIMATELY 95 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE #2 (EAST 192 STREET) WITH A CATCHALL AT THE REA #20621 | DOB VIOLATION - ACTIVE |
| Jul 5, 2023 | PLUMBING COMMISSIONERS REQUEST FOR IMMEDIATE CORRECTION ACTION I OBSERVED NO GPS1 FORM ON SITE AT TIME OF INSPECTION #23-01986 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #05730 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 23, 2026 | C | § 27-2005 ADM CODE PROVIDE HEAVY DUTY MORTISE LOCK AT BUILDING ENTRANCE DOOR , 1st STORY | Oct 29, 2026 |
| Sep 17, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE (VERTICAL CRACKS) BRICK AND MORTAR JOINTS AT VARIOUS LOCATIONS AT EAST EXTERIOR WALL RUNNING UP TO PARAPET WALL | Oct 22, 2026 |
| Sep 9, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK AND ASSEMBLY | Oct 14, 2026 |
| Apr 30, 2026 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BELL/BUZZER/INTERCOM CASE AT BUILDING ENTRANCE DOOR FROM STREET , 1st STORY | Jun 4, 2026 |
| Apr 30, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK AND ASSEMBLY FROM STREET AT LOBBY, 1st STORY | Jun 4, 2026 |
| Apr 30, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER/INERCOM VISIBLE DEFECTIVE WITH LOOSE SCREWS ON . , 1st STORY | Jun 4, 2026 |
| Feb 6, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT ENTRANCE DOOR TO BUILDING AT PUBLIC HALL, 1st STORY | Feb 12, 2026 |
| Dec 29, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | Jan 4, 2026 |
| Dec 29, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR , 1st STORY | Feb 2, 2026 |
| Dec 29, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY AT BUILDING VESTIBULE DOOR , 1st STORY | Feb 2, 2026 |
| Dec 9, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | Dec 15, 2025 |
| Dec 9, 2025 | C | Apt 3A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FRAME IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 23, 2025 |
| Dec 9, 2025 | C | Apt 3A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING WATER EXCEEDING 130 DEGREES F AT ALL WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 15, 2025 |
| Nov 5, 2025 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ENAMEL GLAZE BY METHOD OF REGLAZING THE BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 10, 2025 |
| Nov 5, 2025 | C | Apt 1B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 11, 2025 |
| Nov 5, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DEFECTIVE BELL BUZZER INTERCOM SYSTEM AT ENTRANCE TO BUILDING , 1st STORY | Dec 10, 2025 |
| Sep 22, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK & ASSEMBLY AT BUILDING ENTRANCE DOOR (FROM ENTRANCE TO VESTIBULE) , 1st STORY | Sep 28, 2025 |
| Sep 17, 2025 | A | Apt 3C · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 21, 2025 |
| Sep 17, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT ENTRANCE DOOR TO BLDG , 1st STORY | Sep 23, 2025 |
| Sep 17, 2025 | A | Apt 3C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL-RETURNBUZZER/INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR TO PANNEL AT EAST WALL IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 21, 2025 |
| Sep 16, 2025 | B | Apt 3C · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 21, 2025 |
| Sep 10, 2025 | B | Apt 5G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF UPPER SASH WINDOW AT NORTH WALL FIRST WONDOW FROM LEFT IN THE 3rd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 15, 2025 |
| Sep 10, 2025 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 15, 2025 |
| Sep 10, 2025 | C | Apt 5G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 6, 2025 |
| Sep 10, 2025 | C | Apt 5G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 6, 2025 |
| Sep 10, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKSET AT ENTRANCE TO BLDG AT PUBLIC HALL, 1st STORY | Sep 16, 2025 |
| Sep 10, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE MAILBOX FOR APT 5G AT PUBLIC HALL, 1st STORY | Oct 15, 2025 |
| Sep 10, 2025 | B | Apt 5G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF UPPER SASH WINDOW AT NORTH WALL 2ND WONDOW FROM LEFT IN THE 3rd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 15, 2025 |
| Sep 10, 2025 | B | Apt 5G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE WOOD STOOLS TO THE 1ST AND 2ND WINDOWS AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 15, 2025 |
| Jul 8, 2024 | B | Apt GR3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT BSMT-APT GR3, 1st BSMT-APT FROM NORTH AT EAST , SECTION AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt GR3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTED WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT BSMT-APT GR3, 1st BSMT-APT FROM NORTH AT EAST , SECTION AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt GR3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, WEST WALL, CEILING IN THE 1st ROOM FROM NORTH LOCATED AT BSMT-APT GR3, 1st BSMT-APT FROM NORTH AT EAST , SECTION AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt GR3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE PRIVATE HALLWAY LOCATED AT BSMT-APT GR3, 1st BSMT-APT FROM NORTH AT EAST , SECTION AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt GR3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL IN THE KITCHEN LOCATED AT BSMT-APT GR3, 1st BSMT-APT FROM NORTH AT EAST , SECTION AT SOUTH | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt GR3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTED WOOD FLOOR IN THE FOYER LOCATED AT BSMT-APT GR3, 1st BSMT-APT FROM NORTH AT EAST , SECTION AT SOUTH | Aug 12, 2024 |
| Jun 7, 2024 | C | Apt 5A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 3, 2024 |
| Jun 6, 2024 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Sep 9, 2024 |
| Jun 6, 2024 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Jun 12, 2024 |
| Jan 30, 2024 | B | Apt 5G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN SURFACE AT THE INTERIOR AT BATHTUB IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2024 |
| Jan 30, 2024 | B | Apt 5G · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2024 |
| Jan 30, 2024 | B | Apt 5G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BUZZER SYSTEM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2024 |
| Jan 30, 2024 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2024 |
| Jan 30, 2024 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 5, 2024 |
| Dec 20, 2023 | C | Apt 5A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF 5TH FLOOR 5A KEYLOCK ON RM ENTRY DOOR LEADING TO FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 26, 2023 |
| Apr 6, 2023 | C | Apt 5C · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | May 14, 2023 |
| Apr 5, 2023 | C | Apt 5C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 2n | Apr 29, 2023 |
| Apr 5, 2023 | C | Apt 5C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Apr 29, 2023 |
| Apr 5, 2023 | C | Apt 5C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT A | Apr 29, 2023 |
| Apr 2, 2021 | A | Apt 3D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 2nd ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2021 |
| Apr 2, 2021 | A | Apt 3D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2021 |
| Jun 22, 2020 | C | Apt 1B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE THE WASH BASIN PORCELAIN VANITY IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 28, 2020 |
| Jun 22, 2020 | C | Apt 3D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 18, 2020 |
| Feb 7, 2020 | A | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATH TUB PORCELAIN FINISH IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 12, 2020 |
| May 14, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Aug 17, 2018 |
| Mar 27, 2018 | B | Apt 5H · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE ... IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 1, 2018 |
| Mar 27, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jun 30, 2018 |
| Dec 8, 2017 | B | Apt 3D · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 12, 2018 |
| Nov 1, 2017 | A | Apt 3D · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 4, 2018 |
| Nov 1, 2017 | B | Apt 3D · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 6, 2017 |
| Mar 15, 2017 | B | Apt 3D · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 19, 2017 |
Showing 60 of 62. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 23, 2026 | HPD C | § 27-2005 ADM CODE PROVIDE HEAVY DUTY MORTISE LOCK AT BUILDING ENTRANCE DOOR , 1st STORY | Open |
| Sep 28, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: ERECT APPROXIMATELY 92 LINEAR FEET OF SIDEWALK SHED AT AT EXPOSURE #1 WITH A CATCHALL AT BOTH ENDS AND APPROXIMATELY 27 LINEAR FEET OF SIDEWALK SHED LEADING INTO THE FRONT ENTRANCE ERECT APPROXIMATELY 95 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE #2 (EAST 192 STREET) WITH A CATCHALL AT THE REA | Open |
| Sep 25, 2026 | ECB | Construction: FAILURE TO MAINTAIN. I OBSERVED THE BRICK FACADE AT EXPOSURE #1 AND EXPOSURE #2 WITH EVIDENCE OF STEP CRACKS, VERTICAL AND HORIZONTAL CRACKS AND MISSING MORTAR THROUGHOUT. THESE CONDITIONS HAVE THE POTENTIAL OF | Open |
| Sep 17, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE (VERTICAL CRACKS) BRICK AND MORTAR JOINTS AT VARIOUS LOCATIONS AT EAST EXTERIOR WALL RUNNING UP TO PARAPET WALL | Open |
| Sep 9, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK AND ASSEMBLY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:38 AM ET. BBL 2031670046.