Manhattan · Block 386 · Lot 14 · 10009

256 East 4 Street

3 floors · 6,575 sq ft · built 1900 · class M1 · owner of record: 256 East 4th Development Llc

0open violations
$33,810ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-01-22 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (12) · $33,810 owed
IssuedViolationHearingBalance
May 20, 2026Unknown CLASS - 1
AT TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP SITE MECHANICAL OPERATING EQUIPMENT ( BOOM LIFT ) WASN'T FULLY ENCLOSED AWAY FROM THE PUBLIC AND WAS NOT SEPARATED FROM THE PUBLIC WALKWAY 3307.4.7 WORK OR
#39554446M
Jul 30, 2026
IN VIOLATION
$5,000
May 20, 2026Unknown CLASS - 2
AT THE TIME OF MY INSPECTION DURING WEATHER ADVISORY SWEEP OBSERVED MACHINE OPERATING EQUIPMENT ( BOOM LIFT ) WITHOUT ANY ACTIVE DOT PERMITS. BC 3307.2.1 UPON REVIEW NO PERMITS WAS ACTIVE OR POSTED. FOR PLACEME
#39554448X
Jul 30, 2026
IN VIOLATION
$625
Feb 17, 2026Construction CLASS - 2
TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AT THE TIME OF INSPECTION OF A 5-STORY NEW BUILDING, A CONSTRUCTION FENCE WAS OBSERVED IN PLACE. REVIEW OF DEPARTMENT RECORDS REVEALED THE CONSTRUCTION F
#39550438Y
Mar 23, 2027
DEFAULT
$1,280
Jan 19, 2026Construction CLASS - 1
ICY CONDITIONS OBSERVED ACTIVE SCAFFOLD PLATFORMS& ACCESS AREAS COVERED WITH SNOW& ICE.&ROOF LEVEL DUE TO INADEQUATE HOUSEKEEPING &FAILURE TO REMOVE HAZARDOUS ACCUMULATIONS. CONDITIONS CREATE SLIP HAZARDS & UNS
#39549303Z
Oct 13, 2026
IN VIOLATION
$2,500
Jan 19, 2026Construction CLASS - 1
OBSERVED SUPPORTED SCAFFOLD ERECTED WITH MISSING SECTIONS, INCOMPLETE DECKING, AND ALTERED CONFIGURATION NOT IN ACCORDANCE WITH APPROVED PLANS. AN UNAPPROVED PULLEY/HOISTING SYSTEM WAS INSTALLED ON THE SCAFFOLD
#39549302R
Oct 13, 2026
IN VIOLATION
$625
Dec 1, 2025Construction CLASS - 2
FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, 6 STORY ALTERATION BUILDING STRUCTURAL COMPLETED TO BULKHEAD. OBSERVED AT
#35718008P
Jan 5, 2027
DEFAULT
$3,125
Aug 11, 2025Construction CLASS - 2
ALTERATION OF A 6 STORY BUILDING. OBSERVED ACTIVE CONSTRUCTION SITE WITH SUPPORTED SCAFFOLD @ EXP#1&2 WITH MAKESHIFT WALKING PLATFORM CONNECTION @ THE CORNER OF EXP#1&2 ON MULTIPLE LEVELS. UPON REVIEWING THE AP
#39543539H
Mar 16, 2027
$3,125
Jun 20, 2025Construction CLASS - 1
NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A GAS CAN INADEQUATELY BEING STORED CREATING A POTENTIAL FIRE HAZARD. PROVIDE AND MAINTAIN ADEQUATE STORAGE.
#39541619Z
Mar 23, 2026
IN VIOLATION
$2,500
Jun 20, 2025Construction CLASS - 1
NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS SCATTERED THROUGHOUT 3RD, 4TH FLOOR, AND ROOF LEVEL. THE CONDITION POSES A POTENTIAL
#39541618R
Mar 23, 2026
IN VIOLATION
$2,500
Jun 20, 2025Unknown CLASS - 1
NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED CONSTRUCTION MATERIALS AND DEBRIS STORED 10 FEET WITHIN AN UNENCLOSED PERIMETERS CONTRARY TO CODE 3303.4.4.2. THIS COND
#39541617P
Mar 23, 2026
IN VIOLATION
$5,000
Jun 20, 2025Unknown CLASS - 2
NOTE: AT TIME INSPECTION OF A 6-STORY BUILDING ONGOING CONSTRUCTION OPERATIONS, I OBSERVED A DEBRIS CHUTE IN PLACE ATTACHED TO THE SUPPORTED PIPE SCAFFOLD UPON REQUEST FOR DESIGN DRAWING AND PERMIT NONE WAS PRO
#39541602M
Mar 23, 2026
IN VIOLATION
$2,500
Feb 10, 2025Construction CLASS - 1
FSWO ISSUED FOR WORK WITH OUT PERMIT. ATOI OBSERVED MAJOR DEMOLITION OF ALL 3 FLOORS. THE REMOVAL OF FIRE RATING DRYWALL PARTITION WALLS AND ELECTRICAL WIRING .NO DEMOLITION PERMIT ON FILE WITH THE DEPARTMENT.,
#39138007H
Oct 22, 2026
DEFAULT
$5,030
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 5:47 PM ET. BBL 1003860014.

Look up another building