5 floors · 13 apartments · 18,200 sq ft · built 1920 · class C7 · owner of record: Jenkins Portfolio Companies Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 782 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-17 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 21, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APARTMENTS [ DEFECTIVE BUZZER SYSTEM ] | Nov 25, 2026 |
| Aug 18, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT AT BOILER ROOM | Aug 24, 2026 |
| Aug 10, 2026 | B | Apt 3C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER INTERCOM SYSTEM FROM BUILDING FRONT TO PANEL AT EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 14, 2026 |
| Jun 15, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Sep 18, 2026 |
| Jun 15, 2026 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 2ND FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 20, 2026 |
| Jun 15, 2026 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 20, 2026 |
| Jun 8, 2026 | B | Apt 3B · § 27-2005 HMC: REFIT UPPER AND LOWER WINDOW SASH AT THE FIRST WINDOW FROM WEST AT NORTH IN THE 2nd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jun 8, 2026 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jun 8, 2026 | B | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FIRE ESCAPE GATE IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jan 20, 2026 | B | Apt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING, NORTH, SOUTH AND WEST WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18238412 ISSUED 16-SEP-25 HAS BEEN UPGRADED | Feb 24, 2026 |
| Nov 18, 2025 | A | Apt 3B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2026 |
| Sep 22, 2025 | C | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AOF THE 2ND LOWER SASH WINDOW AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 28, 2025 |
| Jun 20, 2024 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ... 25 SQ FT OF MOLD AT THE EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY | Jul 25, 2024 |
| Mar 10, 2023 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ.FT. AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 15519600 ISSUED 09-NOV-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATI | Apr 14, 2023 |
| Jan 13, 2023 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 15372426 ISSUED 14-SEP-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2 | Feb 17, 2023 |
| Aug 8, 2022 | C | Apt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 1, 2022 |
| Jul 12, 2022 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE NORTH WINDOW JAMB IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 15037128 ISSUED 12-MAR-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27 | Aug 16, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APARTMENTS [ DEFECTIVE BUZZER SYSTEM ] | Open |
| Aug 18, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT AT BOILER ROOM | Open |
| Aug 18, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed |
| Aug 10, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER INTERCOM SYSTEM FROM BUILDING FRONT TO PANEL AT EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 7:53 AM ET. BBL 1020330036.