4 floors · 51,888 sq ft · built 1923 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 51,888 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 788 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3983). Agency page | Dec 31, 2033 in 2614 days | Next due 2033 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: SPALLINGPLASTER AND PAINT IN STAIRWELL #4 FROM 4TH FLOOR TO BULKHEAD LEVEL DUETO WATER DAMAGE/WATER LEAK OBSERVED UPON INSPECTION. REMEDY: REPAIR AN #35732735M | May 29, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720750M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY EXIT DISCHARGES AND EXIT SI #35732731P | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: WIRE MESH VISION PANEL GLASS MISSING ON FIRE RATED SMOKE SEVERLY DOOR OBSERVEDUPON INSPECTION. REMEDY: REPAIR AND/OR REPLACE. #35732734K | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOM AND SMOKE DOORS NOT SELF-CLOSING PROPERLY DUE TO BINDING,MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 416, 415, 413, 407, 307, #35732733Z | May 22, 2026 POP/IN-VIO | $0 |
| Apr 28, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720751Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3L 27-345. NOTED: AT CELLAR LEVEL AT ELECTRICAL SWITCH GEAR ROOM AT SEVERAL LOCATIONS IN ELECTRICAL #35732732R | May 22, 2026 POP/IN-VIO | $0 |
| Jun 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL ELECTRICAL ROOM ONE HOLE NO FIRE STOPPING, ELECTRICAL C #35720751Y | Aug 29, 2025 POP/IN-VIO | $0 |
| Jun 27, 2025 | Construction CLASS - 2 REISSUE #35683078N DATE OF ISSUE: 07-31-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35720750M | Aug 29, 2025 POP/IN-VIO | $0 |
| Jul 31, 2024 | Construction CLASS - 2 REISSUE #35673014P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT TIME OF MY INSPECTION, I OBSERVED AT THE 2ND FLO #35683078N | Oct 4, 2024 POP/IN-VIO | $0 |
| Apr 12, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTE:OBSERVED AT 2ND FLR-STAIRCASE B & C,AT 1ST FLR-EXIT#6 & AT CELLAR LEVEL-D #35673014P | Aug 18, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06954 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06955 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 5:10 PM ET. BBL 2039830001.