Bronx · Block 5654 · Lot 393 · 10475

2551 Pelham Bay Park West

3 floors · 4 apartments · 5,712 sq ft · built 1970 · class C3 · owner of record: Lumi Properties Llc

11open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 409 days
Next cycle year 2027

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Nov 2, 2000Construction Non-Hazardous
WORK W/O A PERMIT. WORK NOTED:ILLEGAL CONVERSION OF PROPERTY, INTO A PARKING LOT. IN ADDITION CURB CUTS WERE ALSO INSTALLED. AT WEST SECTION OF PROPERTY. 4 SPACES FOR MOTOR VEHICLES. REMEDY:FILE PLAINS, PERMITS
#34253836R
Jun 27, 2003
WRITTEN OFF
$0
Jun 15, 1999Construction Non-Hazardous
WORK WITHOUT A PERMIT: HAVING ERECTED A COMBUSTIBLE EXTENSION AT THE FIRST FLOOR SOUTH ELEVATION, ABOUT 8'X 40'X 10'. ALSO, IN THE PROCESS OF CONSTRUCTING A FRAME STRUCTURE, ABOUT 10'X 25'X 10' AT THE SOUTHWES
#34188221M
Jan 28, 2000
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
HPD (7) · C 0 · B 1 · A 6
IssuedClassViolationCorrect by
Apr 30, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 3, 2026
Jun 5, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 8, 2025
Apr 3, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 7, 2024
Mar 17, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 20, 2023
Feb 18, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 24, 2022
Apr 5, 2021A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 9, 2021
Aug 7, 2008BD26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK VESTIBULE TO 1 STY PUB HALL.Sep 11, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 3:42 PM ET. BBL 2056540393.

Look up another building