2 floors · 1 apartments · 2,468 sq ft · built 1928 · class S1 · owner of record: Gra Shoe Repair Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-03-15 (Accepted). Agency page | Dec 31, 2026 in 61 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 28, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35386403R ISSUED ON 2/12/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT AT #35566627Y | May 31, 2022 DEFAULT | $6,250 |
| Dec 7, 2021 | Construction CLASS - 1 UNLAWFUL ACTS FAILURE TO COMPLY WITH COMMISSIONER'S ORDERS.RECORDS INDICATE NO APP.WAS TO CORRECT OR CERTIFY ECB#'S 35583632N & 35386379X.REM:COMPLY WITH COMMISSIONER'S ORDERS. #35634437P | Mar 8, 2022 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITION NOV#35450382K ISSUED ON 10/01/2019.REM:FILE CERTIFICATE OF CORRECTION. #35584607X | Sep 21, 2021 DEFAULT | $3,125 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYWITH COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35584603Z | Sep 21, 2021 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDINGS FOR CORRECTING VIOLATING CONDITION NOV#35258085Y ISSUED 7/11/2017.REM:FILE A CERTIFICATE OF CORRECTIO #35584606Y | Sep 21, 2021 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYWITH COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35584604K | Sep 21, 2021 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYWITH COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35584600N | Sep 21, 2021 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYWITH COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35584602R | Sep 21, 2021 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYWITH COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35584605M | Sep 21, 2021 DEFAULT | $6,250 |
| Jul 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLYWITH COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35584601P | Sep 21, 2021 DEFAULT | $6,250 |
| Jun 26, 2021 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.FAILURE TO CORRECT AND CERTIFY SUMMONS#35386379X.REM:COMPLY WITH CODE. #35583632N | Sep 14, 2021 DEFAULT | $6,250 |
| May 18, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35386165K ISSUED 2/12/19&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.WORK W/OPERMIT.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C. #35531652X | Aug 10, 2021 DEFAULT | $12,500 |
| Jan 22, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35386403R ISSUED ON 02-12-19 AND TO FILE A CERTIFICATE OF CORRECTION TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT COMPLY #35526197R | Apr 13, 2021 DEFAULT | $12,500 |
| Jan 5, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35386165K ISSUED ON 2/12/19 & TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1&1RCNY102-01.WORK W/O PERMIT.COMPLY W/ COMMISSIONER'S #35525641J | Mar 30, 2021 DEFAULT | $6,250 |
| Jan 5, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMON/VIOLATION#35864038H ISSUED ON 2/12/19 & TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1&1RCNY102-01.WORK W/O PERMIT.COMPLY W/ COMMISSIONER'S #35525640H | Mar 30, 2021 DEFAULT | $12,500 |
| Nov 6, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35386403R ISSUED ON 02-12-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WHAT WITHOUT A PERMI #35523483Y | Jan 26, 2021 DEFAULT | $6,250 |
| Nov 6, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35501085L ISSUED ON 09-01-20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER #35523482M | Jan 26, 2021 DEFAULT | $3,125 |
| Nov 4, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35386165K ISSUED ON 02-12-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WHAT WITHOUT A PERMI #35523476X | Jan 26, 2021 DEFAULT | $6,250 |
| Sep 1, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386165K ISSUED ON 02/12/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35518757X | Mar 2, 2021 IN VIOLATION | $3,125 |
| Sep 1, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#3586403RH ISSUED ON 02/12/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A CERT OF C #35518756Y | Mar 2, 2021 IN VIOLATION | $6,250 |
| Sep 1, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: NOTED: EXP#1 INSTALLED GRADE. IT SHOULD BE 18". REMEDY: MAKE NECESSARY REPAIRS. #35501085L | Mar 2, 2021 IN VIOLATION | $3,125 |
| Jan 21, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35461257P ISSUED ON 11-29-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/CODE. #35467717Y | Jan 26, 2021 IN VIOLATION | $1,250 |
| Jan 21, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386403R ISSUED ON 02/12/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/CODE. #35467716M | Jan 26, 2021 IN VIOLATION | $6,250 |
| Jan 21, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386165K ISSUED ON 02/12/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/CODE. #35467715K | Jan 26, 2021 IN VIOLATION | $3,125 |
| Nov 29, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386165K ISSUED ON 02/12/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. INSTALLED WASHING MACHINE W/O PERMIT. REMEDY: COMPLY W/COMM'S O #35431377M | Jan 19, 2021 IN VIOLATION | $1,250 |
| Nov 29, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT EXP#1 INSTALLED GAS VENT INCORRECTLY AT 12" ABOVE GRADE-THE CORRECT HEIGHT SHOULD BE 18". REMEDY: MAKE NECESSARY REPAIRS. OBTAIN ALL THE REQUIRED PER #35461257P | Aug 11, 2020 IN VIOLATION | $1,563 |
| Nov 29, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386403R ISSUED ON 02/12/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. @ 1ST FL,WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FI #35431376K | Jan 5, 2021 IN VIOLATION | $2,500 |
| Oct 1, 2019 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDINGS DEPARTMENT RECORDS.NOTED 1ST FLOOR USED/CONVERTED TO ADULT PHYSICAL CULTURE ESTABLISHMENT MASSAGE PARLOR"TOP BEAUTY SPA"WITH 4 MASSAGE ROOMS,1-SLEEPING ROOM,1 SHO #35450382K | Feb 11, 2020 IN VIOLATION | $6,250 |
| Sep 14, 2019 | Construction CLASS - 1 REISSUE#35442324M DATE OF ISSUE 8-2-19 EXPOSURE # THE GAS VENT INSTALLED INCORRECTLY AT 12' ABOVE GRADE THE CORRECT HIGHT SHOULD BE 18". REMEDY: REPAIR &/OR REPLACE. #35452280Z | Dec 29, 2020 IN VIOLATION | $1,250 |
| Sep 12, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386165K ISSUED ON 02/12/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE #35428892J | Feb 9, 2021 IN VIOLATION | $1,250 |
| Sep 12, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35386403R ISSUED ON 02/12/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O PERMIT AT 1ST FL. REMEDY: COMPLY W/COMM'S ORDER &/ #35428891H | Feb 9, 2021 IN VIOLATION | $6,250 |
| Aug 2, 2019 | Construction CLASS - 1 REISSUE #35422275R DATE OF ISSUE: 4/28/19 AT EXPOSURE #1 THE GAS VENT INSTALLED INCORRECTLY AT 12" ABOVE GRADE. THE CORRECT HEIGHT SHOULD BE18". REMEDY: REPAIR AND/OR REPLACE #35442324M | Feb 11, 2020 IN VIOLATION | $312 |
| Jul 15, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/ VIOLATION #35386403R ISSUED ON 02/12/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT OT 28-201.1 AND 1RCNY 102-01. WORK W/O A PERMIT. #35401200J | Feb 9, 2021 IN VIOLATION | $2,500 |
| Jul 15, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/ VIOLATION #35386165K ISSUED ON 02/12/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT OT 28-201.1 AND 1RCNY 102-01. WORK W/O A PERMIT. #35401201L | Feb 9, 2021 IN VIOLATION | $1,250 |
| May 15, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #5346016K ISSUED ON 7-19-18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR NO FILE STOPPING AT CE #35398951X | Feb 11, 2020 IN VIOLATION | $1,250 |
| Apr 28, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT EXPOSURE#1 THE GAS VENT INSTALLED INCORRECTLY AT 12" ABOVE GRADE.THE CORRECT HEIGHT SHOULD BE 18".REM:REPAIR AND OR REPLACE. #35422275R | Feb 11, 2020 IN VIOLATION | $625 |
| Apr 28, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35386168X ISSUED ON 02/12/19 AND TO FILE A CERTIFICATE OR CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR GAS VENT INCORRECT #35398234N | Feb 9, 2021 IN VIOLATION | $1,250 |
| Mar 5, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35346016K ISSUED ON 07/19/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR NO FIRE STOPPING IN #35395407Z | Jan 5, 2021 IN VIOLATION | $1,250 |
| Feb 12, 2019 | Unknown CLASS - 1 EC 400.8 UNPERMITTED USE OF FLEXIBLE CORDS. OBSERVED THE INSTALLATION OF AN EXTENSION CORD INTO AN ARMORED CABLE RACEWAY TO SUPPLY POWER FORELECTRICAL EQUIPMENT. REMEDY: COMPLY WITH CODE/USE ONLY AS PERMITTED #35386382R | Apr 27, 2021 IN VIOLATION | $1,600 |
| Feb 12, 2019 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NOTED: AT 1ST STORY, FULL HEIGHT PARTITIONS ERECTED CREATING 6 ROOMS AND 1 2 PC (SINK AND TOILET) BATHROOM. WORK DONEWITHOUT A PERMIT. REMEDY: OBTAIN ALL REQUIRED PERMITS #35386403R | Jan 5, 2021 IN VIOLATION | $2,500 |
| Feb 12, 2019 | Plumbing CLASS - 1 FAILURE TO HAVE NEW OR ALTERED PLUMBING TESTED. OBSERVED IN A ROOM A WASHING MACHINE INSTALLED THAT D.O.B DOES NOT SHOW ANY TEST BEING DONE FOR THIS INSTALLATION. REMEDY: PERFORM TEST #35386166M | Jan 19, 2021 IN VIOLATION | $1,250 |
| Feb 12, 2019 | Unknown CLASS - 2 ELECTRICAL WORK W/O A PERMIT. OBSERVED THROUGHOUT 1ST FL AREA THE INSTALLATION OF BRANCH CIRCUIT WIRING FOR LIGHTING AND POWERS IN ROOMS INSTALLED W/O A PERMIT. NO APPLICATION ON FILE COVERS THE INSTALLATION OF #35386380N | Apr 27, 2021 IN VIOLATION | $800 |
| Feb 12, 2019 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED BELOW A LAVATORY FLEXIBLE WATER SUPPLIES BEING USED TO SUPPLY HOT AND COLDWATER TO THE LAVATORY WHICH IN A COMMERCIAL USE BUILDING IS NON CODE C #35386167Y | Jan 19, 2021 IN VIOLATION | $500 |
| Feb 12, 2019 | Unknown CLASS - 1 BC 1006.1 FAILURE TO PROVIDE ILLUMINATION. OBSERVED FROM REAR OF PREMISES TO DOOR LEADING TO FRONT ENTRANCE,NO LIGHTS INSTALLED TO PROVIDE ILLUMINATION AS REQUIRED. REMEDY:COMPLY W/ CODE/PROVIDE PROPER ILLUMINA #35386379X | Apr 27, 2021 IN VIOLATION | $800 |
| Feb 12, 2019 | Zoning CLASS - 2 ILLEGAL USE IN C1 DISTRICT. NOTED:OBSERVED AT 1ST STORY 6 ROOMS BEING USED AS ILLEGAL MASSAGE PARLOR TO PERFORM BODY MASSAGES BY FEMALE STAFF AND IS IN VIOLATION OF ZR 12-10,73-36,BULLETIN 2013-010. REMEDY:DISC #35386404Z | Jan 5, 2021 IN VIOLATION | $1,250 |
| Feb 12, 2019 | Construction CLASS - 1 WORK W/O A PERMIT. OBSERVED IN A ROOM W/ FOOD STUFF A WASHING MACHINE INSTALLED W/ WATER SUPPLY PIPING. DOB RECORDS DO NOT SHOW ANY PERMITS BEING ISSUED FOR THE INSTALLATION OF THIS WASHING MACHINE. REMEDY:OBTA #35386165K | Jan 19, 2021 IN VIOLATION | $1,250 |
| Feb 12, 2019 | Unknown CLASS - 2 FAILURE TO PROVIDE/MAINTAIN ACCESS/WORK SPACE ABOUT ELECTRICAL EQUIPMENT. OBSERVED THROUGHOUT 1ST FL AREA THE INSTALLATION OF CEILING HEIGHTPARTITION WALLS THAT BLOCK THE ACCESS TO CEILING MOUNTED FLUORESCENT L #35386381P | Apr 27, 2021 IN VIOLATION | $500 |
| Feb 12, 2019 | Unknown CLASS - 2 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT,APPARATUS,MATERIALS DEVICES,APPLIANCES,OR WIRING IN USE. OBSERVED THROUGHOUT 1ST FL AREA DEFECTIVE LIGHTING(UNLIT) IN USE OBSERVED OVERHEAD LIGHTING UNLIT,DESPI #35386383Z | Apr 27, 2021 IN VIOLATION | $800 |
| Feb 12, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 OF BUILDING A GAS VENT INSTALLED INCORRECTLY AT 12" ABOVE GRADE. THE CORRECT HEIGHT IT SHOULD BE INSTALLED ABOVE GRADE IS 18". REM #35386168X | Jan 19, 2021 IN VIOLATION | $1,250 |
| Feb 12, 2019 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BUILDING DEPT RECORDS. C OF O#38222 STATES 1ST STORY TO BE A STORE. NOTED:AT 1ST STORY,OBSERVED AN ADULT PHYSICAL CULTURE ESTABLISHMENT W/ 6 ROOMS. ALL 6 ROOM #35386402P | Jan 5, 2021 IN VIOLATION | $1,250 |
| Nov 1, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35346016K ISSUED 07/19/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. @ CELLAR LEVEL @ CEILING #35395917Z | Jan 8, 2019 IN VIOLATION | $1,250 |
| Jul 19, 2018 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPT RECORDS.NOTED: AT THE TIME OF INSPECTION OBSERVED MASSA GE PARLOR WITH 5 ROOMS WITH BEDS.ALSO NOTED 1 ROOM HAD PERSONAL ITEMS #35346355P | Jan 18, 2019 IN VIOLATION | $3,125 |
| Jul 19, 2018 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT.PROPERTY LOCATED IN A C1-2 LOCAL RETAIL DISTRICT. AT TIME OF INSPECTION OBSERVED 1ST FLOOR OCCUPIED AS MASSAGE PARLOR WITH 5 ROOMS CONTAINING MASSAGE TABLES,BODY OIL AND #35346356R | Jan 18, 2019 IN VIOLATION | $3,125 |
| Jul 19, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER:NO FIRE STOPPING PER BC 712.3,27-345-NOTED:@CELLAR LEVEL @CEILING THERE AREA MULTIPLE AREAS MISSING FIRE PROOFING.FL JOIST ARE EXPOSED @THESE AREAS/REM:PROVIDE/ #35346016K | Jan 18, 2019 IN VIOLATION | $2,500 |
| Jul 19, 2018 | Construction CLASS - 2 WORK WITHOUT A PERMIT.AT CELLAR LEVEL ERECTED PARTITIONS TO CREATE A ROOM WITH ELECTRICAL BY CONNECTED TO LIGHT SOCKETS AND LIGHT SWITCHES.REM:OBTAIN ALL REQUIRE PERMITS. #35346017M | Jan 18, 2019 IN VIOLATION | $1,250 |
| Jul 19, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT FRONT ENTRANCE ERECTED PARTITIONS TO CREATE SMALL SPACE W/DOOR BLOCKING THE "EXIT"SIGN.REM:REPAIR AND/OR REPLACE #35346015Z | Jan 18, 2019 IN VIOLATION | $625 |
| Mar 12, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35258085Y ISSUED ON 07/11/17, AND TO FILE A CERTIFICATE OF CORRECT ION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2) AN ACCEPTABLE CERTIFIC #37009528J | Nov 20, 2018 IN VIOLATION | $1,250 |
| Feb 16, 2018 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS OCCUPANCY CONTRARY TO C/O #38222. ILLEGAL OCCUPANCY NOTED: (FIRST FLOOR ILLEGALLY CONVERTED TO ADULT PHYSICAL CU #35299430R | May 15, 2018 WRITTEN OFF | $0 |
| Feb 16, 2018 | Zoning CLASS - 2 ZR 73-36 FIRST FLOOR ILLEGALLY CONVERTED TO ADULT PHYSICAL CULTURE ESTABLISHMENT AND PHYSICAL CULTURE ESTABLISHMENT WITHOUT BSA APPROVAL AS PER ZR 12-10 "TOP BEAUTY SPA". REM: DISCONTINUE ILLEGAL OCCUPANCY. #35299431Z | May 15, 2018 WRITTEN OFF | $0 |
| Feb 16, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). AT THE REAR OF THE ESTABLISHMENT. I OBSERVED THE EXIT DOOR AT THE FIRST FLOOR WAS EQUI #35299433M | May 15, 2018 WRITTEN OFF | $0 |
Showing 60 of 64. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #17695 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #22139 | DOB VIOLATION - ACTIVE |
| Nov 25, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00732 | DOB VIOLATION - ACTIVE |
| Dec 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00777 | DOB VIOLATION - ACTIVE |
| Dec 11, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00747 | DOB VIOLATION - ACTIVE |
| May 29, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00727 | DOB VIOLATION - ACTIVE |
| May 29, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00724 | DOB VIOLATION - ACTIVE |
| May 29, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00729 | DOB VIOLATION - ACTIVE |
| Oct 31, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01005 | DOB VIOLATION - ACTIVE |
| May 16, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00517 | DOB VIOLATION - ACTIVE |
| May 16, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00519 | DOB VIOLATION - ACTIVE |
| May 16, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00518 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #15095 | DOB VIOLATION - ACTIVE |
| Oct 4, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00388 | DOB VIOLATION - ACTIVE |
| Mar 11, 2016 | CONSTRUCTION #CZMTF03KP | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #18331 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 25, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 11, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| May 29, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| May 29, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| May 29, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 31, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| May 16, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| May 16, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| May 16, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Oct 4, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 9:39 AM ET. BBL 4082600033.