5 floors · 119,715 sq ft · built 1929 · class W7 · owner of record: Rabbi Isaac Etal
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2156). Agency page | Dec 31, 2026 in 48 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 119,715 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 413 days | Next cycle year 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-09 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Apr 18, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG WALLS. OBSERVED OPEN MORTAR JOINTS, CRACKED STONE DECOR MASONRY, OPEN COOPER METAL CORNICE, BROKEN GLASS MULTIPLE LOCATIONS AT EXPOSURES 1, 2, 4, EAST, SOUTH, NORTH ELEVATIONS REMEDY: OWNER TO REPAIR AND/OR REPLACE #SR11204YC | DOB VIOLATION - ACTIVE |
| Mar 14, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED BROKE N WINDOWS ON EXP1 & 2 AND AT ROOF.ALSO OBSERVED CRACKED BRICK WORK AND STEP CRACKS IN MULTIPLE LOCATION ON EXP1 & 3.REMEDY:REPAIR AND/OR REPL ACE BUILDING FACADE AND APPURTENANCES #SR11203XN | DOB VIOLATION - ACTIVE |
| Sep 27, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION OBSERVED CRACKED BROKEN WINDOWS AT MULTIPLE LEVELS OF FACADE AND AT ROOF LEVEL OBSERVED MULTIPLE BROKEN WINDOWS. REMEDY: REPAIR AND/OR REPLACE #SR11209DO | DOB VIOLATION - ACTIVE |
| May 17, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO CRACKED STONE WORK AND DAMAGED/SEPARATED MORTOR JOINTS AT PARAPET LEVEL ON EXPOSURE 1 NORTH ELEVATION. ALSO LARGE VERTICLE CRACK AT CHIMNEY AND LARGE HORIZONTAL CRACK/SEPARATED MORTAR JOINT PARAPET EXP4 S(ELEV).REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES UNDER DI #SR11203XN | DOB VIOLATION - ACTIVE |
| May 17, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DAMAGED MORTAR JOINT,STEP CRACKS IN MULTIPLE LOCATIONS NEAR PARAPET LEVEL ON EXPOSURE 4 SOUTH ELEVATION. ALSO OBSERVED CRACKED STONE WORK AND DETERIORATED MORTAR JOINTS & LARGE CRACKS ON EXP2 N ELEV @ PARAPET LEVEL. REMEDY: REPAIR AND #SR11202XN | DOB VIOLATION - ACTIVE |
| Aug 6, 2020 | CONSTRUCTION DUE TO A CAR RUNNING INTO THE SIDEWALK SHED. THE VEHICLE CRASH INTO 5 METAL COLUMNS AND CROSS BRACES ARE BENT #CNE01DG | DOB VIOLATION - ACTIVE |
| Aug 6, 2020 | CONSTRUCTION THE STRUCTURE RENDERED NON COMPLAINT DUE TO A CAR RUNNING INTO THE SID EWALK SHED THE FOLLOWING DAMAGES ACCURED. THE VEHICLE CRASH INTO 5 MET AL COLUMS AND CROSS BRACES ARE BENT METAL I BEAMS FELL TO THE GROUND A SECTION OF THE SIDE IS COMING UNSUPPORTED #NE01DG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 10:58 PM ET. BBL 1021560083.