Manhattan · Block 1789 · Lot 29 · 10035

254 East 125 Street

5 floors · 13 apartments · 14,280 sq ft · built 1900 · class C7 · owner of record: 254-125 Llc

5open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
43dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-26 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
HPD (4) · C 2 · B 2 · A 0
IssuedClassViolationCorrect by
Jul 5, 2024CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJul 31, 2024
Jul 5, 2024CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJul 31, 2024
Oct 24, 1995BApt 2B · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE OR REPLACE SPRINGS WINDOW NORTH ROOM 2 STY EAST APT 2B. LOCATED AT APT 2BDec 11, 1995
Oct 24, 1995BApt 2B · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE & ROACHES THROUGHOUT 2 STY EAST APT 2B. LOCATED AT APT 2BDec 11, 1995

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 7:33 PM ET. BBL 1017890029.

Look up another building