5 floors · 19 apartments · 11,547 sq ft · built 1910 · class D7 · owner of record: Singlee Lau, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 13, 2021 | Construction CLASS - 1 ON 01/13/2021 AT APPROX.. 3:00PM I OBSERVED ACTIVE GAS COMMERCIAL COOKING EQUIPMENT INSTALLED BEING SUPPLIED GAS FROM PROPANE TANKS IN THE COMMERCIAL ESTABLISHMENT (LA NUEVA VICTORIA RESTAURANT) LOCATED ON THE #39034866J | Sep 2, 2021 IN VIOLATION | $0 |
| Jan 13, 2021 | Construction CLASS - 1 ON 01/13/2021 AT APPROX.. 3:00PM I OBSERVED GAS PIPING AND COMMERCIAL COOKING EQUIPMENT INSTALLED IMPROPERLY IN THE COMMERCIAL ESTABLISHMENT (LA NUEVA VICTORIA RESTAURANT) LOCATED ON THE GROUND LEVEL OF THE ABO #39034865H | Sep 2, 2021 IN VIOLATION | $0 |
| Jan 13, 2021 | Construction CLASS - 1 ON 01/13/2021 AT APPROX 3:00PM I OBSERVED ACTIVE GAS COMMERCIAL COOKING EQUIPMENT INSTALLED BEING SUPPLIED GAS FROM PROPANE TANKS CONTRARY TO WHAT IS REQUIRED BY MANUFACTURER IN THE COMMERCIAL ESTABLISHMENT (LA #39034867L | Sep 2, 2021 IN VIOLATION | $0 |
| Nov 16, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. LACK OF A SYST EM OF AUTOMATIC SPRINKLER WHERE IS REQUIRED AS PER BC 903.2 AND 27-954FOR TRANSIENT USE AT APT. # 31 (FL 3) REMEDY: DISCONTINUE ILLEGAL #35374275N | Apr 25, 2019 IN VIOLATION | $0 |
| Nov 16, 2018 | Unknown CLASS - 2 PERMANET DWELLING USED/CONVERTED FOR TOTHER THAN PERMANNET-RESIDENTIALPURPOSES.C OF O #7662 INDICATES BUILDING TO BE LEGALLY APPROVED AS CLASS"A" MULTIPLE DWELLING.NOW APT#3 (FL-3) USED/CONVERTED TO TRANSIENT #35374276P | Apr 25, 2019 IN VIOLATION | $0 |
| Nov 16, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1 (2008 CODE) 27-366;BC 10214 (2014 CODE FOR TRANSIENT USE AT APT # 31(FL 3)REMEDY #35347798Z | Apr 25, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 14, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00038 | DOB VIOLATION - ACTIVE |
| Apr 14, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00039 | DOB VIOLATION - ACTIVE |
| Apr 14, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00040 | DOB VIOLATION - ACTIVE |
| Feb 6, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00055 | DOB VIOLATION - ACTIVE |
| Feb 6, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00056 | DOB VIOLATION - ACTIVE |
| May 14, 1992 | ELECTRIC SIGNS #ST09P | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 14, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 14, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 14, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 6, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 6, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 9:29 PM ET. BBL 1012420042.