5 floors · 9 apartments · 7,420 sq ft · built 1920 · class C7 · owner of record: Icer Of 2530 7th Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 27, 2024 | Construction CLASS - 2 ATOI AT BEAUTY SALON AT 1ST FLOOR COMMERCIAL SPACE AT PREMISES, MISSING CEILING TILE, WATER DAMAGED CEILING TILES AND LOOSE CERAMIC FLOOR TILES, REPAIR AND/OR REPLACE; REPLACE MISSING AND DAMAGED CEILING TILES #39123194K | Oct 31, 2024 DEFAULT | $2,425 |
| Sep 6, 2019 | Construction CLASS - 2 WORK WITHOUT PERMIT:NOTED ON FIRST FLOOR APARTMENT#1 ERECTED FULL HEIGHT PARTITIONS WITH(2)ENTRANCE DOOR TO SUB-DIVIDE BEDROOM IN TO(2)BEDROOMS WITH ELECTRICAL LINES FOR LIGHTS SWITCHES AND OUTLETS.REMEDY:OBTAI #35422017Y | Nov 7, 2019 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08855 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 8, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TREAD 11TH FROM BOTTOM UP AT PUBLIC HALL, 2nd STORY | Jan 12, 2026 |
| Dec 5, 2025 | A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Mar 10, 2026 |
| Dec 5, 2025 | A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT EXIT DOOR LEADING TO NORTH YARD AT PUBLIC HALL, 1st STORY | Mar 10, 2026 |
| Dec 5, 2025 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 1st STORY | Dec 31, 2025 |
| Dec 5, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD STORAGE AT BALCONY AT FRONT AT FIRE ESCAPE, 3rd STORY | Jan 9, 2026 |
| Dec 5, 2025 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD STORAGE AT PUBLIC HALL, 2nd STORY | Jan 9, 2026 |
| Dec 5, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD STORAGE AT BALCONY AT FRONT AT FIRE ESCAPE, 2nd STORY | Jan 9, 2026 |
| Dec 5, 2025 | B | § 27-2010, 2011, 2012 ADM CODE CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE RUBBISH AT PUBLIC HALL, 1st STORY | Jan 9, 2026 |
| Apr 6, 2023 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF USING SCREW JACK TO HOLDING THE CEILING, DOB COMPLAIN NUMBER # 311-140-21167 AT CELLAR | Apr 12, 2023 |
| Apr 6, 2023 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING PAVING AT REAR YARD YARD | Apr 12, 2023 |
| Apr 6, 2023 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF COLLAPSING BRICKES AND CEMENT AT CEILING, DOB COMPLAIN NUMBER # 311-140-21167 AT CELLAR | Apr 12, 2023 |
| Dec 28, 2022 | B | Apt 5 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SHOWER LEVER IN THE BATHROOM LOCATED AT APT 5, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 1, 2023 |
| Aug 1, 2022 | A | Apt 3 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED WITH SHEETROCK AND STUDS FROM FLOOR TO CEILING CREATING ADDITIONAL ROOM IN THE 3rd ROOM FROM EAST LOCATED AT APT 3, 2nd STORY, | Nov 4, 2022 |
| Aug 1, 2022 | A | Apt 1 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED FROM FLOOR TO CEILING WITH SHEETROCK AND STUDS CREATING ADDITIONAL ROOM IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, | Nov 4, 2022 |
| Jan 14, 2022 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 9, 2022 |
| Oct 18, 2021 | C | Apt 1 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Nov 11, 2021 |
| Sep 14, 2021 | A | Apt 1 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DRY WALL PARTITION ERECTED FROM FLOOR TO CEILING SUBDIVIDING THE ROOM REDUCING NATURAL HEAT AND VENT,NO ECB WARRANTED AND NO EGRESS OBSTRUC | Dec 18, 2021 |
| Sep 21, 2020 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2020 |
| Feb 13, 2018 | A | Apt 1 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION ERECTED FROM FLOOR TO CEILING WITH DOORS CREATING A ROOM WITHIN A ROOM IN THE 2nd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st | May 19, 2018 |
| Dec 30, 2013 | C | Apt 7 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 7, 4 | Jan 27, 2014 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 7:11 PM ET. BBL 1020320033.