Manhattan · Block 774 · Lot 8 · 10011

253 West 24 Street

6 floors · 59,250 sq ft · built 1920 · class N2 · owner of record: 253 West 24th Street, Llc

16open violations
$0ECB/OATH penalties owed
2HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-31 (Accepted). Agency page

Dec 31, 2026
in 47 days
2 of 2 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 59,250 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 774). Agency page

Dec 31, 2034
in 2969 days
Next due 2034

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (16) · C 2 · B 11 · A 3
IssuedClassViolationCorrect by
Jun 14, 2022B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, NORTH AND WEST WALLS AT KITCHEN AREA (APPROX. 60-70 SQ. FT.) AT BASEMENTJul 19, 2022
Jun 14, 2022B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, NORTH AND WEST WALLS AT KITCHEN AREA (APPROX. 60-70 SQ. FT.) AT BASEMENTJul 19, 2022
Jun 14, 2022C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL AT 1st PUBLIC HALL FROM NORTH, 2nd STORYJun 20, 2022
Apr 12, 2022B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL APPROX 8 SQ FT AT BASEMENT AT COMMUNITY KITCHEN ORIGINAL VIOLATION 14720702 ISSUED 11-DEC-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).May 17, 2022
Dec 14, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BASEMENT AT 2nd COMMUNITY BATHROOM FROM EAST AT CENTER, 2nd STORYJan 18, 2022
Dec 14, 2021A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS AT BASEMENT AT 2nd COMMUNITY BATHROOM FROM EAST AT CENTER, 2nd STORYMar 19, 2022
Dec 14, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED MATERIAL AT CEILING AT BASEMANT AT COMMUNITY KITCHENJan 18, 2022
Dec 14, 2021A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT BASEMANT AT COMMUNITY KITCHENMar 19, 2022
Dec 13, 2021B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS AT BASEMENT AT COMMUNITY KITCHENJan 17, 2022
Dec 13, 2021B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL AT BASEMENT AT COMMUNITY KITCHENJan 17, 2022
Dec 13, 2021C§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING APPROX 8SQ FT AT 1st COMMUNITY BATHROOM FROM NORTH, 2nd STORYDec 19, 2021
Dec 13, 2021B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN AT NORTH WALL AT 1st COMMUNITY BATHROOM FROM NORTH, 3rd STORYJan 17, 2022
Dec 13, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT NORTHWEST SECTION AT BASEMENTJan 17, 2022
Dec 13, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERAIL AT CEILING AT NORTHEAST SECTION AT BASEMENTJan 17, 2022
Dec 13, 2021A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT NORTHEAST SECTION AT BASEMENTMar 18, 2022
Dec 14, 2011B§ 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES AT CELLARJan 18, 2012

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Closed
Jul 31, 2026ECBConstruction: AT THE TIME OF MY INSPECTION I OBSERVED THAT THE SIDE WALK SHED INSTALLED, THE BRACES DID NOT MEET THE MINIMUM HEIGHT ACCORDING TO APPROVED PLAN.Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:16 PM ET. BBL 1007740008.

Look up another building