Brooklyn · Block 2657 · Lot 33 · 11222

253 Nassau Avenue

4 floors · 6 apartments · 7,200 sq ft · built 1928 · class S9 · owner of record: 253 Nassau Avenue Llc

13open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
57dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 57 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-22 (Accepted). Agency page

Dec 31, 2026
in 57 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 73 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 301 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 788 days
Next cycle year 2028

Open violations

ECB / OATH (4) · $2,500 owed
IssuedViolationHearingBalance
Nov 19, 2020Construction CLASS - 2
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35478053Y ISSUED ON 07/20/20 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.FAILURE TO MAINTAIN REMEDY:COM
#35524045Z
Mar 31, 2021
IN VIOLATION
$1,250
Nov 19, 2020Construction CLASS - 2
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35478052M ISSUED ON 07/20/20 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.FAILURE TO MAINTAIN REMEDY:COM
#35524044R
Mar 31, 2021
IN VIOLATION
$1,250
Feb 21, 2020Cranes and Derricks CLASS - 1
ROOF SYSTEM REMOVAL IN PROGRESS. UNSAFE USE OF MOTORIZED HOIST SYSTEM AT EXPOSURE#4 ROOF: NO SAFETY TIEBACK, ROPE AND COPPER STONE PIECES USED AS COUNTERWEIGHT. IMPROPER HARDWARE., DISCONTINUE USE
#39018037M
Dec 10, 2020
IN VIOLATION
$0
Feb 21, 2020Construction CLASS - 2
ROOFING SYSTEM REMOVAL IN PROGRESS. NO DOB PLANS PROVIDED ON TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; MAKE SITE SAFE. PROVIDED ROOF WATERPROOFING AS REQUIRED. CONTACT DOB.
#39018033P
Dec 10, 2020
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#08447
DOB VIOLATION - ACTIVE
Sep 2, 2020FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#03922
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#20330
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 2, 2020AEUHAZ FTC-AEU-HAZ
Active
HPD (5) · C 0 · B 3 · A 2
IssuedClassViolationCorrect by
May 5, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 8, 2026
Jun 10, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 13, 2025
Jun 4, 2008BApt 4R · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW 4 STY APT 4R 1ST ROOM FROM KITCHEN. , SECTION '' ''Jul 9, 2008
Jun 4, 2008BApt 4R · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR SINK 4 STY APT 4R KITCHEN. , SECTION '' ''Jul 9, 2008
Jun 4, 2008BApt 4R · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC FIXTURE CEILING 4 STY APT 4R CENTER ROOM. , SECTION '' ''Jul 9, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 11:19 PM ET. BBL 3026570033.

Look up another building