Manhattan · Block 589 · Lot 9 · 10014

253 Bleecker Street

4 floors · 3 apartments · 2,608 sq ft · built 1829 · class S3 · owner of record: 253 Bleecker Street Llc

18open violations
$34,375ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-29 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (6) · $34,375 owed
IssuedViolationHearingBalance
Nov 5, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED EXPOSURE #3 FACADE IN A DETERIORATED CONDITION WITH MULTIPLE CRACKS THROUGHOUT AND STUCCO BULGING AT SECOND-FLOOR LINTELS.
#39165965P
Mar 5, 2026
DEFAULT
$25,000
Sep 10, 2024Unknown CLASS - 2
EXPIRED SIDEWALK SHED PERMIT-AT TIME OF INSPECTION SIDEWALK SHED#M00114992-L1-SH WAS EXPIRED SINCE 06/28/2024.REM:RENEW PERMIT.
#35686400X
Dec 19, 2024
IN VIOLATION
$625
Oct 18, 2023Construction CLASS - 2
AT TIME OF INSPECTION OF A 4 STOREYS BUILDING UNDER FACADE PERMIT OPERATION I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE # 1 NOT BEING MAINTAIN ADEQUATELY OBSERVED EXPOSED PROTRUDING BOLTS AND SCREWS WITH SHA
#39522667J
Sep 19, 2024
IN VIOLATION
$0
Feb 11, 2022Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN A CODE-COMPLIANT MANNER.NOTED:DURING INSPECTION OBSERVED AT EXP.#3/REAR,FACADE IS IN STATE OF DISREPAIR W/MULTIPLE CRACKS THROUGH OUT,BULGING OVER 2ND & 3RD FIR WINDOWS.ALSO STAIRWAY
#35644501J
May 12, 2022
DEFAULT
$6,250
Oct 27, 2021Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39046718X ISSUED8/30/21 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.NO C/C ON FILE COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35562502M
Jun 2, 2022
IN VIOLATION
$1,250
Aug 30, 2021Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED SECTION OF EXTERIOR SIDING MISSING, HANGING AND LOOSE ON 3RD FLOOR LEVEL AT EXPO # 02 OVER ADJACENT 1-STORY COMMERCIAL SPACE. ALSO OBSERVED FRONT FACADE INSTATE OF DISREPAIR CONDI
#39046718X
Mar 10, 2022
IN VIOLATION
$1,250
DOB (7)
IssuedViolationStatus
Jan 14, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED MISSING SIDING ON EXPOSURE 2 AND DAMAGED WINDOW FRAMES AND SPALLED/ SPALLING STUCCO EXPOSURE 3. REMEDY: REPAIR AND OR REPLACE
#SR102XN01
DOB VIOLATION - ACTIVE
Sep 10, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION,IT WAS OBSERVED AT EXP1 BULDGING BRICKS ABOVE 4TH FLOOR LINTEL LINE.PARAPET WALL APPEARED TO BE BULDGING WITH A MISSING BRICK,A A BRO KEN COPING STONE AND AT 3RD FLOOR WINDOW LINTEL WAS CRACKED/BROKEN.REM EDY:REPAIR AND/O
#SR10201MA
DOB VIOLATION - ACTIVE
Apr 4, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. OBSERVED AT EXP 1 SOU ELEVATION DAMAGED COPING STONE, MISSING BRICK FACE & CRACKS, SPALLING & CORROSIONS OF FIRE ESCAPE EXP 2 N ELEV:MISSING/LOOSE SIDING EXP 3 EAST ELE. DAMAGE STUCCO,CRACK & BULGING. REMEDY: REPAIR AND OR REPLACE
#SR0201NS
DOB VIOLATION - ACTIVE
Jun 10, 2022CONSTRUCTION
FTM BLDG IN SAFE CONDITION. EXP1 STUCCO DETERIORATING FROM BRICK WALL DAMAGED COPING AT PARAPET. REMEDY: OWENR TO RETAIN NYS PE AND DOB REGISTERED CONTRACTOR TO EVALUATE ENTIRE BUILDING AND PERFORM NECESSARY REPAIRS UNDER PERMIT. FILE APPLICATION BY 07/15/2022 BEGIN WORK BY 08/15/2022 COMPLETE WORK
#FEU10201IK
DOB VIOLATION - ACTIVE
May 11, 2022FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00034
DOB VIOLATION - ACTIVE
Nov 24, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00020
DOB VIOLATION - ACTIVE
Aug 30, 2021CONSTRUCTION
AT TIME OF INSPECTION OBSERVED SECTION OF EXTERIOR SIDING MISSING, HANGING AND LOOSE ON 3RD FLOOR LEVEL AT EXPO # 02 OVER ADJACENT 1-STORY COMMERCIAL SPACE. ALSO OBSERVED FRONT FACADE INSTATE OF DISREPAIR CONDITIONS WITH BRICK MISSING, LOOSE PARAPET COPING STONES, BULGING WALL AND FALLING CONDITION.
#21-00976
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
May 11, 2022AEUHAZ FTC-AEU-HAZ
Active
Nov 24, 2021AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 6:13 AM ET. BBL 1005890009.

Look up another building