7 floors · 40 apartments · 34,578 sq ft · built 2023 · class D1 · owner of record: 2519 Sedgwick Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,578 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 468 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1147 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 23, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OF NB 7 STORY BUILDING ACTIVE JOBSITE OBSERVED STEEL BEAMS WELDED TO BASE PLATES AND BASE PLATES BOLTED ON RETAINING WALLS UPON REVIEW STEEL STRUCTURAL DRAWING IT WAS ONLY SHOWING BASE PLA #39518206P | Oct 15, 2024 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 28, 2026 | B | § 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE. | Nov 2, 2026 |
| Sep 21, 2026 | B | Apt 3A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM/BELL BUZZER FROM PANEL AT BUILDING ENTRANCE TO EAST WALL IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 26, 2026 |
| Sep 21, 2026 | B | Apt 3G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM/BELL BUZZER FROM PANEL AT BUILDING ENTRANCE TO SOUTH WALL IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 26, 2026 |
| Apr 29, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Aug 2, 2026 |
| Feb 12, 2026 | B | Apt 4G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHENETTE LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt 4G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE KITCHENETTE LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 19, 2026 |
| Dec 8, 2025 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOME AT NORTH WALL PRIVET HALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Jan 12, 2026 |
| Dec 8, 2025 | C | Apt 2B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Dec 7, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 28, 2026 | HPD B | § 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE. | Open |
| Sep 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM/BELL BUZZER FROM PANEL AT BUILDING ENTRANCE TO EAST WALL IN THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM/BELL BUZZER FROM PANEL AT BUILDING ENTRANCE TO SOUTH WALL IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 9:33 AM ET. BBL 2032370156.