Queens · Block 8227 · Lot 39 · 11362

251-30 Northern Boulevard

2 floors · 3,600 sq ft · built 1924 · class K2 · owner of record: Cassaro Frank

74open violations
$17,850ECB/OATH penalties owed
0HPD class C (immediately hazardous)
412dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027

Open violations

ECB / OATH (11) · $17,850 owed
IssuedViolationHearingBalance
Sep 25, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35720129Y., COMPLY WITH COMMISSIONER'S ORDER
#39205652H
Dec 1, 2026
PENDING
$2,500
Sep 25, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720131N., FILE A CERTIFICATE OF CORRECTION
#39205653J
Dec 1, 2026
PENDING
$1,250
Sep 25, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720126Z., FILE A CERTIFICATE OF CORRECTION
#39205654L
Dec 1, 2026
PENDING
$1,250
Sep 25, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720130L., FILE A CERTIFICATE OF CORRECTION
#39205651X
Dec 1, 2026
PENDING
$1,250
Oct 14, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE); 27-366; BC 1021.1(2014 CODE); BC 1006.3(2022 CODE) FOR 2 ROOMS USED AS
#35720130L
Dec 23, 2025
IN VIOLATION
$2,500
Oct 14, 2025Unknown CLASS - 1
ELECTRICAL WORK WITHOUT A PERMIT AT 2ND FLOOR. ELECTRICAL LINES AND OUTLETS INSTALLED FOR HOT WATER HEATER, WASHER AND DRYER. REMEDY: OBTAINPERMIT.
#35720129Y
Dec 23, 2025
IN VIOLATION
$1,600
Oct 14, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM. NOTED: CREATED 1 ROOM AT 2ND FLOOR USED AS SLEEPING QUARTERS/BEDROOM WITHOUT R
#35720131N
Dec 23, 2025
IN VIOLATION
$2,500
Oct 14, 2025Construction CLASS - 2
WORK WITHOUT A PERMIT AT 2ND FLOOR. INSTALLED WATER AND WASTE LINES FOR SHOWER ROOM. PLUMBING LINES INSTALLED FOR HIT WATER HEATER AND WASHER. REMEDY: OBTAIN PERMITS.
#35720128M
Dec 23, 2025
IN VIOLATION
$1,250
Oct 14, 2025Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O #98491. RECORDS INDICATE,2ND FLOOR IS LEGALLY APPROVED AS 3 OFFICES. NOW, 2ND FLOOR IS ILLEGALLY OCCUPIED/CONVERTED INTO A HEALTH AND FITNESS ESTABLISHMENT/AMBULATOR
#35720126Z
Dec 23, 2025
IN VIOLATION
$2,500
Oct 14, 2025Zoning CLASS - 2
ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT. A PRIBITED USE PER ZA 12-10 OPERATING IN A C1-2 ZONING DSITRICT. DOING BUSINESS AS "K ACUPUNTURE AND BODY WORK" ON THE 2ND FLOO
#35720125R
Dec 23, 2025
IN VIOLATION
$1,250
Aug 25, 2016Boilers CLASS - 2
AS PER CLASS 2(B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER D.O.B.RECORDS.SUBMIT A CURRENT BO-9 REPORT CORRECT ALL VIOLATING CONDITIONS AND SUBMIT THE CERTIFICATE OF CORRECTION.
#32076945Z
Oct 11, 2016
IN VIOLATION
$0
DOB (32)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#17689
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#16284
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#31946
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#11548
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#10569
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#32306
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#20389
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#12747
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#12896
DOB VIOLATION - ACTIVE
Mar 11, 2016CONSTRUCTION

#CZMTF01VP
DOB VIOLATION - ACTIVE
Oct 1, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
#11901
DOB VIOLATION - ACTIVE
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#16772
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#18285
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#15028
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#19880
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#23063
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#21671
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#21560
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#21591
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#21098
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#22263
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#23723
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#29826
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#28637
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#28980
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#28728
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#29969
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#37534
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#40746
DOB VIOLATION - ACTIVE
Jun 7, 1994LOCAL LAW 62/91 - BOILERS

#01616
DOB VIOLATION - ACTIVE
Jun 28, 1993LOCAL LAW 62/91 - BOILERS

#09682
DOB VIOLATION - ACTIVE
Nov 5, 1990BOILER
32....INSTALL NEW BAROMETIC DAMPER ON FLUE PIPE EXISTING DAMPER DEFECTIVE
#52755-01
DOB VIOLATION - ACTIVE
DOB NOW Safety (31)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Oct 1, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Active
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 7, 1994Boiler LL6291
Active
Jun 28, 1993Boiler LL6291
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#35720129Y., COMPLY WITH COMMISSIONER'S ORDEROpen
Sep 25, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720131N., FILE A CERTIFICATE OF CORRECTIONOpen
Sep 25, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720126Z., FILE A CERTIFICATE OF CORRECTIONOpen
Sep 25, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS VIO#35720130L., FILE A CERTIFICATE OF CORRECTIONOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:33 PM ET. BBL 4082270039.

Look up another building