34 floors · 2,084,079 sq ft · built 1986 · class O4 · owner of record: Wfp Tower D Co Lp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 16). Agency page | Dec 31, 2026 in 48 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 2,084,079 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 779 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $11,700 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2025-11-25) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 26, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION,CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION #3 #39547376K | Dec 15, 2026 DEFAULT | $1,280 |
| May 8, 2025 | Unknown CLASS - 1 AN INCIDENT THAT OCCURRED ON 04-28-2025 AT THIS JOBSITE WHERE A WORKER FELL APPRO 12 FEET HEIGHT FROM SCAFFOLD AND WAS TAKEN TO HOSPITAL BY AMBULANCE UPON REVIEW THE DEPARTMENT RECORDS IT WAS REVEAL THAT THE GE #39539974K | Feb 2, 2027 | $7,500 |
| Apr 28, 2025 | Construction CLASS - 1 A WORKER FELL OFF A DOUBLE FRAME PLATFORM SCAFFOLD APPROXIMATELY 12 FEET IN HEIGHT DURING SIDEWALK SHED DISMANTLING OPERATION AND INJURED HIS RIBS AND LEGS, INSPECTION REVEAL THE INCIDENT OCCURRED AROUND 3:30 #39539579K | Feb 18, 2027 DEFAULT | $12,500 |
| Apr 28, 2025 | Construction CLASS - 1 IN RESPONSE TO AN INCIDENT WHERE A WORKER FELL OFF A DOUBLE FRAME PLATFORM SCAFFOLD APPROXIMATELY 12 FEET IN HEIGHT DURING SIDEWALK SHED DISMANTLING OPERATION AND INJURED HIS RIBS AND LEGS, INSPECTION REVEAL #39539582L | Jan 19, 2027 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Jan 22, 2019 | ELEVATOR #9027/642596 | DOB VIOLATION - ACTIVE |
| Jul 16, 2008 | ELEVATOR #9444/268486 | DOB VIOLATION - ACTIVE |
| Aug 23, 2006 | ELEVATOR #9444/171501 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 4:38 PM ET. BBL 1000160150.