Manhattan · Block 190 · Lot 7505 · 10013

25 North Moore Street

17 floors · 37 apartments · 111,829 sq ft · built 1924 · class RM · owner of record: Unavailable Owner

24open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
57dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 57 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 73 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 111,829 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 178 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 178 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 301 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 474 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 788 days
Next cycle year 2028
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 190). Agency page

Dec 31, 2030
in 1518 days
Next due 2030
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-22 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 26, 2017Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING WALL AND APPURTENANCES. NOTE: EXPOSURE #1 SOUTH ELEVATION:-I OBSERVED LOOSE AND HANGING WINDOW PANEL GASKETS AT 2ND FLOOR SPANDREL. EXPOSURE #4 EAST ELEVATION:-LOOSE AND HA
#35264315L
Jan 11, 2018
IN VIOLATION
$0
DOB (6)
IssuedViolationStatus
Nov 11, 2020FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
#00004
DOB VIOLATION - ACTIVE
Sep 6, 2019(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
#00006
DOB VIOLATION - ACTIVE
Jan 26, 2018(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#00009
DOB VIOLATION - ACTIVE
Jan 26, 2018(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#00010
DOB VIOLATION - ACTIVE
Jan 3, 2017(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#00007
DOB VIOLATION - ACTIVE
Dec 1, 2016ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
#04232
DOB VIOLATION - ACTIVE
DOB NOW Safety (17)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Oct 23, 2023Elevators FTC-VT-CAT1-NJ
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-NJ
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Nov 11, 2020Facades FISPFCS
CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
Active
Sep 6, 2019Elevators ACJ1
Active
Jan 26, 2018Elevators ACJ1
Active
Jan 26, 2018Elevators ACJ1
Active
Jan 3, 2017Elevators ACJ1
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 2:57 AM ET. BBL 1001907505.