23 floors · 809,401 sq ft · built 1921 · class O4 · owner of record: 25 Broadway Office Properties Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 809,401 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $777,600 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 853 days | Filing window not open yet |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 13). Agency page | Dec 31, 2033 in 2627 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #900020. REMEDY: FILE ACCEPTABLE REPORT. #37036669R | Jun 8, 2027 DEFAULT | $1,280 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#800020.REMEDY:SUBMIT ACCEPTABLE REQUIRE #37022838L | Feb 2, 2023 IN VIOLATION | $0 |
| Jun 10, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:ATTHE TIME OF INSPECTION OBSERVED.EXPOSURE#3 WEST ELEVATION VERTICAL AND STEPPED CRACKS ON STONE MASONRY FACADE AT MULTIPLE LOCATIONS CRACKS A #35559773R | Aug 26, 2021 ADMIT/IN-VIO | $0 |
| Apr 30, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE OR APPURTENANCES.NOTED:ATOI,OBSERVED@1)EXP1,E ELEVATION(BROADWAY);SPALLED-ERODED STONE SECS IN MULTIPLE LOCATIONS@18-19FLS.2)EXP4,N ELEVATION(MORRIS ST);SPALLED STONE SE #35560019N | Sep 9, 2021 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 16, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911465 | DOB VIOLATION - ACTIVE |
| Dec 17, 2021 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00054 | DOB VIOLATION - ACTIVE |
| May 3, 2021 | CONSTRUCTION EMERGENCY WORK ORDER. TAKE AND PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE TO PROTECT PUBLIC. REMEDY: INSTALL PUBLIC PROTECTION AT EXP 3 WEST ELEV. AND EXP 4 NORTH ELEV. REMOVE ANY LOOSE UNSAFE MATERIAL ON FACADE #LLFA01MB | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2000007 | DOB VIOLATION - ACTIVE |
| Mar 26, 2018 | FACADE SAFETY PROGRAM #HAZ87434 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Feb 16, 2024 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Dec 17, 2021 | Elevators EVCAT5 | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
None open.