Manhattan · Block 90 · Lot 7502 · 10038

25 Ann Street

10 floors · 9 apartments · 24,953 sq ft · built 1923 · class RM · owner of record: Edgar House Condominium

4open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 795 days
Next cycle year 2028
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

On fileCycle 10 filing on record: SWARMP (2026-08-05)

Open violations

ECB / OATH (2) · $1,250 owed
IssuedViolationHearingBalance
Apr 18, 2018Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG FACADE AND APPURTENANCES AS NOTED: EXP2: VERTICAL CRACKS IN BRICKS, SPALLED BRICKS EXP 3: STEP CRACKING. EXP4: DAMAGED/CRACKED WATER TABLE, STEP CRACKING, FAILING PATCH. RMDY:
#35318621K
Aug 23, 2018
IN VIOLATION
$1,250
Jul 22, 2008Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE: VARIOUS HAIRLINE CRACKS (APPROX 3'-4') ARE ON THE FLOORS OF THE APTS ON THE 3RD, 2ND, 8TH & 10TH FLOORS. REMEDY: REPAIR DEFECTS.
#34689450L
Sep 11, 2008
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 12:04 AM ET. BBL 1000907502.

Look up another building