5 floors · 10 apartments · 7,448 sq ft · built 2019 · class D1 · owner of record: Ismael Realty Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2019-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 5, 2025 | Construction CLASS - 2 FAILURE TO CERTIFY VIOLATION # 39056040K, FILE A CERTIFICATE OF CORRECTION #39159420Y | Nov 18, 2025 IN VIOLATION | $625 |
| Sep 5, 2025 | Construction CLASS - 2 FAILURE TO CERTIFY CORRECTION FOR VIOLATIONS # 39056039N, FILE A CERTIFICATE OF CORRECTION #39159419R | Nov 18, 2025 IN VIOLATION | $1,250 |
| Apr 4, 2025 | Unknown CLASS - 1 AT TIME OF INSPECTION, I OBSERVED MULTIPLE UNSAFE CONDITIONS SUCH AS; TRIPPING HAZARDS, SUPPORTED PIPE SCAFFOLD IN USE WHILE UNDER AMENDS, NO SIDEWALK SHED INSPECTION LOG OR SUPERINTENDENT LOG, NO FLOOR SIGNS, #39538798X | Apr 2, 2026 IN VIOLATION | $5,000 |
| Apr 4, 2025 | Site Safety CLASS - 1 AT TIME OF INSPECTION, I OBSERVED MULTIPLE UNSAFE CONDITIONS SUCH AS; TRIPPING HAZARDS, SUPPORTED PIPE SCAFFOLD IN USE WHILE UNDER AMENDS, NO SIDEWALK SHED INSPECTION LOG OR SUPERINTENDENT LOG, NO FLOOR SIGNS, #39538796M | Apr 2, 2026 IN VIOLATION | $10,000 |
| May 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35574285N ISSUED ON 6/18/2021, AND FAILURE TO FILE A CERTFIICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTI #37028396K | Aug 6, 2024 DEFAULT | $3,125 |
| Feb 11, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN/INSTITUTE SAFETY MEASURES: UNSAFE EQUIPMENT. AT TIME OF INSPECTION OBSERVED MASONRY CUTTING GRINDER WITH PROTECTIVE GUARD REMOVED AND PLUGGED INTO POWER SUPPLY READY TO USE. CITED ABOVE AFFE #39056040K | Aug 30, 2022 IN VIOLATION | $2,500 |
| Feb 11, 2022 | Unknown CLASS - 1 FAILURE TO MAINTAIN A RECORD OF PRE-SHIFT SAFETY MEETING FOR EACH WORKER. AT TIME OF INSPECTION PREMISES UNDER NB #421436743 OBSERVED APPROXIMATELY 7 WORKERS AT AN ACTIVE JOB SITE ASKED COMPETENT PERSON ONSITE #39056039N | Aug 30, 2022 IN VIOLATION | $4,971 |
| Jul 13, 2021 | Construction CLASS - 2 28-105.1 WORK WITHOUT A PERMIT.NOTE AT THE TIME OF MY INSPECTION OF A NEW 5 STORY BUILDING AT ROOF LEVEL,I OBSERVED WOODEN STRUCTURE USE AS OVERHEAD PROTECTION AT EXP4.REVIEW OF DEPARTMENT RECORDS SHOWS THAT NO #35574942Y | Apr 26, 2022 IN VIOLATION | $0 |
| Jul 7, 2021 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-INADEQUATE GUARDRAILS.NOTE:AT TIME OF INSPECTION OBSERVED ACTIVE JOB SITE 5 STORY NEW BUILDING AT ROOF LEVEL UNDER CONSTRUCTION #35575963H | Apr 26, 2022 IN VIOLATION | $0 |
| Jun 18, 2021 | Construction CLASS - 1 BC 3301.2 FAILURE TO PROVIDE SAFETY MEASURES(CONTROLLED ACCESS ZONE-(AZ)AT TIME OF INSPECTION OF THIS 5 STORY NEW BUILDING I OBSERVED NO CAZOR WARNING LINE SYSTEM ON THE 5TH FLOOR.ALL WORKERS WHERE USING P.F.A. #35574284L | Sep 7, 2021 IN VIOLATION | $0 |
| Apr 28, 2021 | Unknown CLASS - 1 PERMIT HOLDER FAILED TO ENSURE ALL WORKERS RECEIVE SITE SAFETY ORIENTATION.NOTE:AT THE TIME OF MY INSPECTION OF AN ACTIVE JOB SITE,I OBSERVED 15 WORKERS PERFORMING CONSTRUCTION ACTIVITIES ON SITE.UPON REQUEST #35558230X | Jul 20, 2021 IN VIOLATION | $0 |
| Apr 28, 2021 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION.NOTE:AT THE TIME OF MY INSPECTION OF A 5 STORY BLDG AT BAULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS.I OBSERVED CONSTRUCTION DEBRI #35558229Z | Jul 20, 2021 IN VIOLATION | $0 |
| Nov 18, 2020 | Construction CLASS - 1 BC3301.7,AC28-105.12.2 NO SITE-SPECIFIC FORMWORK DESIGN DRAWINGS PRESEENT PER BC3301.7. RESPONDENT FAILED TO PRESENT SITE-SPECIFIC FORMWORK DRAWINGS DURING CEU INSPECTION ON 7/30/2020. UPON CEU AUDIT OF FORMWOR #35537609H | Feb 9, 2021 IN VIOLATION | $0 |
| Oct 30, 2020 | Construction CLASS - 2 FAILURE TO PROVIDE ADEQUATE LOT LINE FENCE WHERE REQUIRED.AT THE TIME OF INSPECTION OF A 5 STORY BUILDING I OBSERVED THEY WERE AT 9TH LEVEL AT IN THE 1ST LEVEL THE CONCRETE COLUMNS ARE NOT ENCLOSED WITH IN THE #35496568M | Jan 19, 2021 IN VIOLATION | $0 |
| Sep 2, 2020 | Construction CLASS - 1 AC28-104.7.7 BC107,BC1613,BC1604 INADEQUATE DESIGN DOCUMENT/DRAWINGS. PER CEU AUDIT,UPON REVIEW CONSTRUCTION DOCUMENTS SIGNED & SEALED BY KEMBA WALCOTT,PE,FROM KLE CONSULTING ENGINEERING PLLC,THE CONSTRUCTION #35537605K | Mar 2, 2021 IN VIOLATION | $0 |
| Sep 1, 2020 | Construction CLASS - 1 BC3305.3.3,BC3305.3.6 NO SITE-SPECIFIC FORMWORK DESIGN DRAWINGS PRESENT PER BC3301.7.RESPONDENT FAILED TO PRESENT SITE-SPECIFIC FORMWORK DRAWING DURING CEU INSPECTION ON 7/30/2020.UPON REVIEW OF SUBMITTED FORM- #35537603R | Dec 1, 2020 IN VIOLATION | $0 |
| Aug 20, 2020 | Construction CLASS - 1 RCNY 101-06(SECTION C) FALSE STATEMENTS IN CERTIFICATES,FORMS,WRITTEN STATEMENTS,APPLICATIONS,REPORTS,OR CERTIFICATES OF CORRECTION. PER CEUAUDIT,CEU OBSERVED TR-1 SPECIAL INSPECTION REPORT FOR SUBSURFACE INVES #35537600L | Nov 17, 2020 DEFAULT | $37,500 |
| Jul 30, 2020 | Construction CLASS - 1 BC1704.1.2 BASED ON CEU SITE VISIT & INSPECTION,& THE FINDINGS OF CEU AUDIT,THE RESPONDENT FAILED TO PERFORM TR-1 SPECIAL INSPECTION DUTIES 1 SPECIAL INSPECTOR DUTIES.SPECIAL INSPECTION NON-COMPLIANCE ITEMS INC #35537604Z | Dec 1, 2020 IN VIOLATION | $0 |
| Nov 27, 2019 | Construction CLASS - 1 FAILURE TO ENSURE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION EQUIPMENT.NOTE:AT THE TIME OF MY INSPECTION OF A PROPOSED 5STORY BUILDING AT FOUNDATION PHASE.I OBSERVED A WORK WITH ONE LEG O #35464299R | Jun 8, 2021 IN VIOLATION | $0 |
| Nov 27, 2019 | Unknown CLASS - 1 PERMIT HOLDEER FILED TO ENSURE WORKERS ATTEND PRE SHIFT SAFETY MEETING.NOTE:AT THE TIME OF MY INSPECTION OF A PROPOSE 5STORY BUILDING AT FOUNDATION PHASE,I REQUESTED THE PRE SHIFT SAFETY LOG AND NON WAS PROVID #35464300P | Jan 5, 2021 IN VIOLATION | $0 |
| Aug 17, 2018 | Construction CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. NOTED: BUILDING WAS DEMOLISHED TO GRADE, BETWEEN ADJOINING PROPERTIES CONSTRUCTION FENCE WAS REMOVED LEAVING THE PROPERTY UNPROTECTED.THERE #35244386K | Oct 2, 2018 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 12, 2019 | PLUMBING THE BORO COMMISSIONER OF THE DEPARTMENT OF BUILDINGS CITY OF NEW YORK, HAS REVOKED PERMIT #421436743-01 PL AND ORDERED ALL PLUMBING WORK STOPPED EXCEPT TO MAKE SITE SAFE. CONSTRUCTION WORK IS APPROX 20% COMPLETE. #19-00540 | DOB VIOLATION - ACTIVE |
| Jul 9, 2019 | CONSTRUCTION BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421436743 D UE TO GENERAL CONTRACTOR WITHDRAWAL #19-00530 | DOB VIOLATION - ACTIVE |
| Oct 29, 2018 | CONSTRUCTION PARTIAL COLLAPSED OF THE SIDE CONCRETE STEPS LEADING TO THE REAR YARD DUE TO ONGOING CONSTRUCTION ACTIVITIES AT ADJOINING PROPERTY 25-40 36TH STREET ( PARTIAL VACATE ONLY TO THE SIDE OF WALKWAY #CER01CK | DOB VIOLATION - ACTIVE |
| Oct 29, 2018 | CONSTRUCTION DAMAGED OBSERVED TO HAVE BEEN SUSTAINED TO SIDE WALKWAY /STAIRS TO REAR OF PREMISES EXPSOURE # 2 DUE TO CONSTRUCTION ACTIVITIES AT 25-40 36TH STREET JOB # 421436743 PERMIT -ENTIRE /POSTED #CER01KC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.