3 floors · 2 apartments · 4,726 sq ft · built 1988 · class S9 · owner of record: Soho New York Lodging, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2020-11-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-22 (Accepted). Agency page | Dec 31, 2026 in 69 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 30, 2019 | Construction CLASS - 1 FILED A CERTIFICATE FORM. APPLICAITON ETC CONTAINING A MATERIAL FALSE STATEMENT. NOTED: AT TIME OF INSPECTION OBSERVED A FALSE CERTIFICATE IN SECTION #26 OF PW1 JOB 421682888 APPLICATION APPROVED ON 4-11-19 BY #35404468Y | Jul 30, 2019 IN VIOLATION | $5,000 |
| Jul 5, 2018 | Construction CLASS - 1 SEC: 28-201.1. FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35257491P ISSUED ON 6/27/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/OUT PERMIT. REM: COMPLY W/ #35336895R | Aug 21, 2018 DEFAULT | $12,500 |
| May 11, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35257491P ISSUED ON 06/27/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSI #35337085J | Jun 26, 2018 DEFAULT | $12,500 |
| Dec 21, 2017 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VILATION #35257491P ISSUED ON 06/27/17 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT. #35282059K | Sep 4, 2018 DEFAULT | $6,000 |
| Dec 11, 2017 | Quality of Life CLASS - 2 RESIDENCE ALTERED AS A DWELLING FOR MORE THAN THE NUMBER OF FAMILIES LEGALLY AUTHORIZED BY THE C OF O OR OFFICIAL RECORD. C OF O Q208185 06/22/88 INDICATES 7X10(2)FAMILY DWELLING WITH 2ND AND 3RD FLOO WITH RET #35301980L | Apr 3, 2018 WRITTEN OFF | $0 |
| Nov 9, 2017 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35257491P ISSUED ON 6-27-17 & TO FILE A C OF C PURSUANT TO 28-201 & RCNY 102-01 WORK W/O A PERMIT AT 2ND FL. REMEDY: COMPLY W/COMM'S ORDER. #35296807Y | Apr 3, 2018 WRITTEN OFF | $0 |
| Sep 18, 2017 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35257491P ISSUED ON 06/27/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. AT 2ND FL LEVEL,ERECTED FULL HEIGHT PARTITIONS TO CREATE 2 ROOM #35278211Y | Mar 13, 2018 WRITTEN OFF | $0 |
| Jun 27, 2017 | Quality of Life CLASS - 2 RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES. DOB C OF O# 208185 INDICATES RESIDENCE AS A 2 FAMILY 2ND & 3RD FLR DWELLING, 1ST FLR RETAIL STORE & CELLAR AC #35257492R | Aug 15, 2017 WRITTEN OFF | $0 |
| Jun 27, 2017 | Construction CLASS - 1 WORK W/OUT A PERMIT. WORK NOTED: @ 2ND FLR LEVEL ERECTED FULL HEIGHT PARTITIONS TO CREATE 2 ROOMS & 2 BATHROOM. INSTALLED WATER & WASTE LINES FOR TWO 3PC BATHROOM,2 SINKS, 2 TOILETS, 2 SHOWERS & 2 RESIDENTIAL S #35257491P | Aug 15, 2017 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17421 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #32876 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #12496 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #33371 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #11931 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #22765 | DOB VIOLATION - ACTIVE |
| Nov 22, 2019 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCE AT EXPOSURE 2 THE CONCRETE FILLING HAS FALLING OR LOOSE FROM ROOF DOWN TO 1ST STORY OF THREE STORY BUILDING. #19-01020 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #14639 | DOB VIOLATION - ACTIVE |
| Aug 22, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00732 | DOB VIOLATION - ACTIVE |
| Jul 30, 2019 | CONSTRUCTION #E40101IG | DOB VIOLATION - ACTIVE |
| Jul 2, 2019 | CONSTRUCTION #E40101MM | DOB VIOLATION - ACTIVE |
| Jun 6, 2019 | CONSTRUCTION #E401JT01 | DOB VIOLATION - ACTIVE |
| Dec 8, 2017 | CONSTRUCTION BORO COMMISSIONER HAS ISSUED A STOP WORK ORDER FOR # 421558978 DUE TO APPLICANT WITHDRAWAL #C0101BA | DOB VIOLATION - ACTIVE |
| Sep 20, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00570 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #14924 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #24495 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #24216 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #24330 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #26620 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #24897 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 62/91 - BOILERS #15481 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Aug 22, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 20, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 15, 2017 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HANDRAIL AT STAIRS 1ST. TO 2ND. STY. AT PUBLIC HALL | Jul 20, 2017 |
| Aug 19, 2015 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Sep 23, 2015 |
| Jul 23, 2015 | B | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE ENTRANCE TO VESTIBULE, AT PUBLIC HALL, 1st STORY | Aug 27, 2015 |
| Nov 5, 2010 | B | Apt 3 · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 10, 2010 |
| Nov 5, 2010 | C | Apt 3 · § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCKING MECHANISM AT FRONT DOOR IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 11, 2010 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 6:54 AM ET. BBL 4005800029.