3 floors · 3 apartments · 2,700 sq ft · built 2017 · class C0 · owner of record: Lee, Un
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 17, 2019 | Construction CLASS - 1 BC 3309.10 ROOF PROTECTION. AT TIME OF PROTECTION ON A 3-STORY NEW BUILDING OBSERVED INCOMPLETED ROOF WORK TO BE DONE. UPON REVIEW OF ARCHITECTURAL DRAWINGS PROVIDED,OBSERVED THAT 3'6" METAL RAILINGS STILL NEED #35421273Z | Jul 30, 2019 DEFAULT | $6,250 |
| Apr 17, 2019 | Construction CLASS - 1 SEC. 3301.2 OVERHEAD PROTECTION. AT TIME OF INSPECTION ON A 3 STY NEW BLDG OBSERVED INCOMPLETED ROOF WORK TO BE DONE. UPON REVIEW OF ARCHITECTURAL DRAWINGS PROVIDED OBSERVED THAT 3'6"METAL RAILINGS STILL NEED #35421274K | Jul 30, 2019 DEFAULT | $6,250 |
| Apr 4, 2018 | Construction CLASS - 1 SEC. 3303.4.1 SLIPPING & TRIPPING HAZARD IN AREAS OF CONSTRUCTION. AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE W/CMU BLOCK WALLS. REBAR ON PROGRESS,DURING INSPECTION NOTED ON THE 1ST FL GOING TO #35314424N | Jun 26, 2018 DEFAULT | $6,250 |
| Apr 4, 2018 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO HANDRAILS. AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE W/CMU WALLS & REBAR ON PROGRESS,DURING INSPECTION. NOTE #35314420X | Jun 26, 2018 DEFAULT | $6,250 |
| Apr 4, 2018 | Construction CLASS - 1 SEC. 3301.2 NO OVERHEAD PROTECTION. AT TIME OF INSPECTION OBSERVED AN ACTIVED CONSTRUCTION SITE W/STEEL,CMU BLOCK WALLS,REBAR ON PROGRESS,DURING INSPECTION. NOTED: THERE WAS NOT OVERHEAD PROTECTION @ EXP#4 AT #35314423L | Jun 26, 2018 DEFAULT | $6,250 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 5:22 PM ET. BBL 4008840090.