5 floors · 37 apartments · 36,000 sq ft · built 1920 · class C1 · owner of record: Mgsa Viii Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-12-30 (Accepted). Agency page | Dec 31, 2026 in 50 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 36,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED DETERIORATED PARAPETS AT EXP. #1 & #3. EXP. #1 PARAPET BULGING OUTWARD WITH VERTICAL/STEP CRACKS, LOOSE BRICKS AND UNSTAB #39205496P | Dec 4, 2026 PENDING | $6,250 |
| Mar 23, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED EXPOSURE 1(FRONT) & 3(BACK) 1-5 FLOORS & PARAPET VERTICAL, HORIZONTAL, STEP CRACKS & MISSING, LOOSE MORTAR AT BRICKS CREATIN #39181410L | May 29, 2026 DEFAULT | $25,000 |
| Mar 23, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED EXPOSURE 1(FRONT) & 3(BACK) 1-5 FLOORS & PARAPET VERTICAL, HORIZONTAL, STEP CRACKS & MISSING, LOOSE MORTAR AT BRICKS CREATIN #39181411N | May 29, 2026 DEFAULT | $25,000 |
| Oct 3, 2025 | Construction CLASS - 2 OBSERVED VARIOUS SUPPORT BRACKETS NOT INSTALLED ON A/C UNITS FROM APARTMENTS AND INTERIOR STAIR LEADING TO ROOF LEVEL EGRESS OBSTRUCTED WITH CHAIRS URINARY CUP , FECES /CLOTHES AND WITH VARIOUS GARBAGE., REPAIR #39162517H | Dec 19, 2025 DEFAULT | $6,250 |
| Oct 3, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED AT EXTERIOR FRONT VERTICAL CRACKS AT LEFT SIDE OF FACADE FRONT/ COURT YARD TO MAIN ENTRY DOORWAYS AND RIGHT SIDE OF BUILDINGS 1ST FLOOR LEVEL UP TO MIDSECTION OF 2ND FLOOR LEVEL., #39162511R | Dec 19, 2025 DEFAULT | $25,000 |
| Apr 3, 2024 | Construction CLASS - 1 ALSO OBSERVED DISREPAIR PARAPET BRICK WALLS AND MORE PLACES AT EXPOSURES# 1 & 3 AT EXPOSURE IS CRACK AT 6 FLOOR PARAPET WALL APROXIMATELY 200'FT LINEAR X 10'FT WIDE, AND AT EXPOSURE 3 THE PARAPETH WALL ALSO NEE #39110648N | Jun 7, 2024 DEFAULT | $6,250 |
| Jul 16, 2021 | Construction CLASS - 2 IN ENTRANCE COURTYARD, AT LEFT SIDE, NEAR FIRE ESCAPE AT 4TH FLOOR, VERTICAL CRACK APPEARS AT RIGHT SIDE OF WINDOW, ALSO NOTED VERTICAL CRACKS APPEAR AROUND 5TH FLOOR WINDOW AT FIRE ESCAPE., MAINTAIN EXTERIOR B #39044542M | Jan 7, 2022 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 23, 2026 | CONSTRUCTION REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED EXPOSURE 1(FRONT) & 3(BACK) 1-5 FLOORS & PARAPET VERTICAL, HORIZONTAL, STEP CRACKS & MISSING, LOOSE MORTAR AT BRICKS, STRUCTURAL STABILITY IN QUESTION. #26-00863 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06560 | DOB VIOLATION - ACTIVE |
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400808 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06049 | DOB VIOLATION - ACTIVE |
| May 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00580 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 28, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| May 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 31, 2025 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Nov 5, 2026 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS ILLEGAL APARTMENT CREATED AT BASEMENT UNIT #BB UNDER VACATE ORDER # 261291 ( POSTED DATE 11/5/2026 ) | — |
| Nov 9, 2026 | C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT BOILER AT BOILER ROOM | — |
| Nov 9, 2026 | C | Apt E5 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT E5, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | — |
| Oct 30, 2026 | B | Apt C2 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT THE TOP OF THE STEAM RISER PIPE IN THE KITCHEN LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE BATHROOM LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt BB · § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION ILLEGAL CLASS A APARTMENT CREATED WITH STUDS AND SHEETROCK INCREASING OCCUPANCY FROM 37 TO 38 CLASS A APARTMENTS . IN THE ENTIRE APARTMENT LOCAT | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt BB · § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS BATHROOM IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BB | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt BB · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, .. IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BB | Dec 4, 2026 |
| Oct 30, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Nov 5, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR IN THE 4th ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR IN THE ENTIRE APARTMENT LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt C2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Dec 4, 2026 |
| Oct 29, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE HOLD ITEM AT BULKHEAD | Dec 3, 2026 |
| Oct 29, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER SASH WINDOW, WINDOW AT WEST WALL BETWEEN 3RD AND 4TH STORIES AT PUBLIC HALL STAIRS | Nov 4, 2026 |
| Oct 29, 2026 | B | Apt B6 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 3, 2026 |
| Oct 28, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE BUILDING FRONT YARD | Dec 2, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MARBLE SADDLE AT DOOR IN THE ENTRANCE LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt C4 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BED BLOCKING SAFE EGRESS TO FIRE ESCAPE WINDOW IN THE 5th ROOM FROM EAST LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CLOSET ON THE EAST WALL THROUGHOUT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET UNDER WASH BASIN SINK IN THE BATHROOM LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 5th ROOM FROM EAST LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt A2 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt C6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT C6, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt C6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH BALANCE AT SOUTH WALL IN THE KITCHEN LOCATED AT APT C6, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt C4 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 18, 2026 |
| Oct 23, 2026 | C | Apt C4 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER WINDOW SASH 2ND WINDOW FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt C4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUB FLOOR AROUND RADIATOR IN THE 2nd ROOM FROM EAST LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH BALANCE AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE UNDER SINK IN THE KITCHEN LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE UPPER WINDOW SASH 1ST WINDOW FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | B | Apt B4 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR FRAME IN THE BATHROOM LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 27, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 23, 2026 | C | Apt B4 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 29, 2026 |
| Oct 22, 2026 | C | Apt A8 · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES AT NORTH WALL BEHIND THE STOVE IN THE KITCHEN LOCATED AT APT A8, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 28, 2026 |
| Oct 22, 2026 | B | Apt A8 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CLOSET ON THE EAST WALL AT CEILING AND EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT A8, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 26, 2026 |
| Oct 22, 2026 | C | Apt A8 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE FOYER LOCATED AT APT A8, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 28, 2026 |
| Oct 22, 2026 | B | Apt A8 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES OUTLET AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT A8, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 26, 2026 |
| Oct 22, 2026 | B | Apt B5 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 26, 2026 |
| Oct 22, 2026 | A | Apt B5 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL IN THE BATHROOM LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 25, 2027 |
| Oct 22, 2026 | C | Apt A8 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT A8, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 28, 2026 |
| Oct 22, 2026 | C | Apt B5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 28, 2026 |
| Oct 21, 2026 | C | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRE AT EAST WALL AT BOILER ROOM | Oct 27, 2026 |
| Oct 21, 2026 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF 2X4 STUD INSTALLED TO SUPPORT THE BATHTUB IN APARTMENT ABOVE AT CELLAR | Oct 27, 2026 |
| Oct 21, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT TANK ROOM AT CELLAR | Oct 27, 2026 |
| Oct 21, 2026 | C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT TANK ROOM AT CELLAR | Oct 27, 2026 |
| Oct 20, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BOILER LEAKING WATER AT BOILER ROOM | Oct 26, 2026 |
| Oct 20, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BOILER ROOM | Oct 26, 2026 |
| Oct 20, 2026 | C | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN CLOGGED AT BOILER ROOM | Oct 26, 2026 |
Showing 60 of 391. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Nov 9, 2026 | HPD C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT BOILER AT BOILER ROOM | Open |
| Nov 9, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT E5, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Nov 5, 2026 | HPD I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS ILLEGAL APARTMENT CREATED AT BASEMENT UNIT #BB UNDER VACATE ORDER # 261291 ( POSTED DATE 11/5/2026 ) | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT THE TOP OF THE STEAM RISER PIPE IN THE KITCHEN LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE BATHROOM LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION ILLEGAL CLASS A APARTMENT CREATED WITH STUDS AND SHEETROCK INCREASING OCCUPANCY FROM 37 TO 38 CLASS A APARTMENTS . IN THE ENTIRE APARTMENT LOCAT | Open |
| Oct 30, 2026 | HPD B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS BATHROOM IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BB | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, .. IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BB | Open |
| Oct 30, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR IN THE 4th ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR IN THE ENTIRE APARTMENT LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 30, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 29, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE HOLD ITEM AT BULKHEAD | Open |
| Oct 29, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER SASH WINDOW, WINDOW AT WEST WALL BETWEEN 3RD AND 4TH STORIES AT PUBLIC HALL STAIRS | Open |
| Oct 29, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT B6, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Oct 28, 2026 | DOB Safety | AEUHAZ: | Open |
| Oct 28, 2026 | HPD B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE BUILDING FRONT YARD | Open |
| Oct 23, 2026 | HPD C | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MARBLE SADDLE AT DOOR IN THE ENTRANCE LOCATED AT APT A2, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 23, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 23, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BED BLOCKING SAFE EGRESS TO FIRE ESCAPE WINDOW IN THE 5th ROOM FROM EAST LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 23, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CLOSET ON THE EAST WALL THROUGHOUT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT B4, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 8:23 AM ET. BBL 2032130080.