Manhattan · Block 784 · Lot 15 · 10001

249 West 34 Street

7 floors · 14,686 sq ft · built 1925 · class O6 · owner of record: Hw W 34th St Llc

18open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
51dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-05-31 (Accepted). Agency page

Dec 31, 2026
in 51 days
1 of 1 without an accepted 2026 report yet
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $193,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 103 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1147 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (11)
IssuedViolationStatus
Jul 13, 2026CONSTRUCTION
EMERGENCY WORK ORDER DUE TO DETERIORATED/DAMAGED JOINTS AND/OR LOOSE STONE AT EXP2 W ELEV, 7FL POTENTIAL HAZARD TO PUBLIC & PROPERTY REQUIRING IMMEDIATE COLLECTIVE ACTION. REMEDY:IMMED RETAIN NYS LIC PROF ENG P.E. TO EVALUATE EXISTING CONDITIONS AND DIRECT/SUPERVISE EMERGENCY WORK. (REFER TO VIOLATI
#FA0501JW
DOB VIOLATION - ACTIVE
Feb 21, 2022HAZARDOUS CONDITION (FACADE)
CYCLE 9A UNSAFE REPORT FILED
#910175
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#00156
DOB VIOLATION - ACTIVE
Jan 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
#00498
DOB VIOLATION - ACTIVE
Nov 30, 2007LOCAL LAW 11/98 - FACADE

#NRF42522
DOB VIOLATION - ACTIVE
Jul 2, 1997CONSTRUCTION

#05C1
VIOLATION UNSERVED ECB-ACTIVE
Jul 2, 1997CONSTRUCTION

#05C1
DOB VIOLATION - ACTIVE
Jul 2, 1997CONSTRUCTION

#05C01
DOB VIOLATION - ACTIVE
Mar 5, 1997ZONING

#MTF6RI
DOB VIOLATION - ACTIVE
Mar 5, 1997CONSTRUCTION

#MTF5RI
DOB VIOLATION - ACTIVE
Feb 14, 1991ELEVATOR

#1409B02
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Feb 21, 2022Facades FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Jan 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Active
Nov 30, 2007Facades LL1198
CYCLE 6 NO REPORT FILED
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 11:00 AM ET. BBL 1007840015.