4 floors · 91,620 sq ft · built 1938 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 91,620 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1828). Agency page | Dec 31, 2028 in 778 days | Next due 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 31, 2026 | Construction CLASS - 2 REISSUE ECB#357241481H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIRS B,A 4TH FL STAIR A 3RD FL STAIR B2ND FL STAIR C,D 1ST FL HALLWAY SMOKE DOORS NEAR RM 112,AUDITORIUM EXI #35736146M | Aug 24, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (ROOF)BULKHEAD/STAIR B GLASS PANEL CRACKED/SHATTERED. REMEDY: REPAIR AND/ORREPLACE. #35736225K | Aug 18, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (ROOF)BULKHEADS/STAIRS A, B, E WATER DAMAGE/STAINING TO CEILINGS/WALLS WITHSPALLING PLASTER/PAINT. REMEDY: REPAIR AND/OR REPLACE. #35736226M | Aug 18, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 REISSUE ECB #35721479Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT EVERY FLOOR/THROUGHOUT VARIOUS AREAS INSTALLED/USED KIC #35736148X | Aug 18, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 REISSUE ECB #35721480X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (1ST FL)AUDITORIUM EMERGENCY LIGHTS NO #35736147Y | Aug 18, 2026 POP/IN-VIO | $0 |
| Jul 31, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (BASEMENT)ELECTRIC METER RM STORAGE OF MULTIPLE VARIOUS ITEMS FILE, TRACKS,GARBAGE, BOXES, ETC...REMEDY: COMPLY WITH CODE. #35736149H | Aug 18, 2026 POP/IN-VIO | $0 |
| Aug 6, 2025 | Construction CLASS - 2 REISSUE: 35688988P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER MANNER: INTERIOR DOORS NOT CLOSING PROPERLY AT 2ND FLOOR STAIR N 1ST FL. MAIN ENTRANCE LOBBY DOOR, AUDITORIUM DOORS PLAY ROOM ENTRANCE, E #35721481H | Aug 29, 2025 POP/IN-VIO | $0 |
| Aug 6, 2025 | Construction CLASS - 2 REISSUE: 35688989R-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381 EMERGENCY LIGHTS NOT WORKING-1ST FLOOR EXIT BY STAIRW #35721480X | Aug 29, 2025 POP/IN-VIO | $0 |
| Aug 6, 2025 | Construction CLASS - 2 REISSUE: 35688990Y-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J).ILLEGAL KICKSTOPS MOUNTED ON ALL DOORS @ 4TH FLOORS. REMEDY: COMPLY WI #35721479Z | Aug 29, 2025 POP/IN-VIO | $0 |
| Sep 9, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED EMERGENCY LIGHTS NOT WORKING WHEN TESTED AT 3RD FL GYM(2 LIGHTS), #35688989R | Oct 21, 2024 POP/IN-VIO | $0 |
| Jun 6, 2019 | Construction CLASS - 2 RE-ISSUE#35329200X.DATE OF ISSUE 04/11/2018. FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1;27-381 IN GYM E #35399446J | Aug 15, 2019 DEFAULT | $3,125 |
| Jun 6, 2019 | Construction CLASS - 2 RE-ISSUE #35326549P.DATE OF ISSUE 04/11/2018.FAILURE TO MAINTAIN BLD. IN CODE COMPLIANT MANNER.WATER DAMAGE TO WALLS DUE TO WATER PENETRATION,RETAINING WALLS AT BOILER ROOM,RM #100,RM #104,RM#106;WATER PENETRAT #35422143P | Aug 15, 2019 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Jun 3, 1993 | CONSTRUCTION #B10PR01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Jul 31, 2026 | ECB | Construction: REISSUE ECB#357241481H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIRS B,A 4TH FL STAIR A 3RD FL STAIR B2ND FL STAIR C,D 1ST FL HALLWAY SMOKE DOORS NEAR RM 112,AUDITORIUM EXI | Open |
| Jul 31, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (ROOF)BULKHEAD/STAIR B GLASS PANEL CRACKED/SHATTERED. REMEDY: REPAIR AND/ORREPLACE. | Open |
| Jul 31, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (ROOF)BULKHEADS/STAIRS A, B, E WATER DAMAGE/STAINING TO CEILINGS/WALLS WITHSPALLING PLASTER/PAINT. REMEDY: REPAIR AND/OR REPLACE. | Open |
| Jul 31, 2026 | ECB | Construction: REISSUE ECB #35721479Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: AT EVERY FLOOR/THROUGHOUT VARIOUS AREAS INSTALLED/USED KIC | Open |
| Jul 31, 2026 | ECB | Construction: REISSUE ECB #35721480X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (1ST FL)AUDITORIUM EMERGENCY LIGHTS NO | Open |
| Jul 31, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (BASEMENT)ELECTRIC METER RM STORAGE OF MULTIPLE VARIOUS ITEMS FILE, TRACKS,GARBAGE, BOXES, ETC...REMEDY: COMPLY WITH CODE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:14 AM ET. BBL 1018280015.