2 floors · 180 apartments · 161,012 sq ft · built 1953 · class C6 · owner of record: Deepdale Gardens First Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-18 (Pre-Filing-Pending Payment). Agency page | Dec 31, 2026 in 62 days | 1 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 161,012 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 8349). Agency page | Dec 31, 2029 in 1158 days | Next due 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jul 10, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG SUSTAIND DMG@EXP 1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@EXP1&4 PRTLLY CLLPSD@2ND LEVEL,EXP4WALL BULGNG OUT,&CRCKS ON BRCK VENEER WALLS OBSV.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #060826FEU41101KR (CONTROL #350708)DATED 06/08/2026 #FEU41101KR | DOB VIOLATION - ACTIVE |
| Jun 8, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUSTAIND DMG@EXP 1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@ EXP1&4 PRTLLY CLLPSD@2NDFL LVL,EXP4WALL BULGNG OUT,&CRCKS ON BRC.OWNR TO RTAIN NYSPE TO EVA THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 8/3/26 & COMPLETE/SIGN OFF #FEU31102KR | DOB VIOLATION - ACTIVE |
| Jun 8, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG SUSTAIND DMG@EXP1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@EXP1&4 PRTLYL CLLPSD@2ND LEVEL,EXP4 WALL BULGNG OUT,&CRCKS ON BRCK VENEER WALLS OBSV.OWNR TO IMMED:RTAIN NYSPE&DOB REG CNTRCTR TO IMMED:1.PRTLLY DEMO UNSTBLE ROOF/ ATTIC FL/EXP1&4 WALL E #FEU41101KR | DOB VIOLATION - ACTIVE |
| Jun 6, 2026 | CONSTRUCTION STRUCTURE RENDERED NONCOMPLIANT DUE TO DMG @EXP1 & ROOF CAUSED BY FALL EN TREE. SUBSTANTIAL OPENING CREATED IN ROOF ABOVE FL2 UNIT LEAVING RO OF EXPOSED TO ELEMENTS AND SIGNIFICANT CRACKING TO FACADE. IMPACT COMP ROMISED STRUCTURAL INTEGRITY OF WALL AND AFFECTED AREAS VACATE FL1 AND FL2 UNITS #CER02 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 10, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER.THE BLDG SUSTAIND DMG@EXP 1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@EXP1&4 PRTLLY CLLPSD@2ND LEVEL,EXP4WALL BULGNG OUT,&CRCKS ON BRCK VENEER WALLS OBSV.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #060826FEU41101KR (CONTROL #350708)DATED 06/08/2026 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 8:57 AM ET. BBL 4083490036.